Quick Facts
Total Cost
0
Workers/Unit
h
Labor Hours
0
Resources
0
Machines
0
Steps
KI
Work Steps
Generating image...
15-30 seconds
Error
:
|
CO₂ (kg)
|
|
Alternative
|
Optimization
|
Where to Buy
|
Safety / PPE
|
|||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| KAME-RI-KATO-KASA | Primer | kg | ||||||||||
| KAPU-ME-KARI-KASA | Heavy concrete mixes | m3 | ||||||||||
| KAPU-TO-KAME-KADX | Ready-mixed cement mortar | m3 | ||||||||||
| MERI-ME-KARI-MESA | Rolled waterproofing materials | m2 | ||||||||||
| ME_MEKAKA_PUME | Worker Category 1 | hrs | ||||||||||
| KAME-RI-KAME-KARI_KAKATOME | Bitumen petroleum construction insulation BNI-IV-3, BNI-IV, BNI-V | t | ||||||||||
| KAME-LI-MESA-KANE_KAMEMEME | Construction nails | t | ||||||||||
| KARI-RI-KAME-KARI_MEKAPURI | Gravel M 400-1000, fraction 5(3)-10 mm | m3 | ||||||||||
| KASA-RI-KATO-KARI_KAKAKAME | Heavy concrete wall blocks, dimensions 390x190x188 mm, grade 200 | m3 | ||||||||||
| MEME-ME-KATO-KAME_KAKANETO | Edged coniferous timber (spruce, pine), natural moisture content, length RI-NE.SA m, width 20-90 mm, thickness 20-90 mm, grade III | m3 | ||||||||||
| MEME-ME-KATO-KANE_KAKALIDX | Edged softwood boards, natural moisture content, length RI-NE.SA m, width 100-250 mm, thickness 44-50 mm, grade III | m3 | ||||||||||
| DXME-KASA-KASA_KAMESA | Mobile cranes, lifting capacity 16 t | Machine hours | ||||||||||
| PU_MEKAKA_KANEKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-KAVO-KAPU_KARIRI | Mobile electric bitumen boilers with centrifugal agitator, loading capacity 1000 l | Machine hours | ||||||||||
| DXME-KAVO-KAPU_KARIRI | Electricity: consumption VO.RISA kW·h/machine-hour | Machine hours | ||||||||||
| DXME-MEPU-KARI_KAKATO | Flatbed trucks, load capacity up to 10 tons | Machine hours | ||||||||||
| PU_MEKAKA_KAPUKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
|
CO₂ (kg) — Zusammenfassung
|
||||||||||||
|
CO₂ (kg) wird analysiert...
|
||||||||||||
|
Reg. Price — Zusammenfassung
|
||||||||||||
|
Reg. Price wird analysiert...
|
||||||||||||
|
Alternative — Zusammenfassung
|
||||||||||||
|
Alternative wird analysiert...
|
||||||||||||
|
Optimization — Zusammenfassung
|
||||||||||||
|
Optimization wird analysiert...
|
||||||||||||
|
Where to Buy — Zusammenfassung
|
||||||||||||
|
Where to Buy wird analysiert...
|
||||||||||||
|
Safety / PPE — Zusammenfassung
|
||||||||||||
|
Safety / PPE wird analysiert...
|
||||||||||||
approx.
| kWh | ||||||
|---|---|---|---|---|---|---|
|
KI
|
- | |||||