AI
Workers
Use this position in your own project
The price above is a reference benchmark. OpenConstructionERP lets you reuse this position in a full project estimate — with your regional prices, quantities and margins.
KI
Work Steps
Generating image...
15-30 seconds
Error
:
|
CO₂ (kg)
|
|
Alternative
|
Optimization
|
Where to Buy
|
Safety / PPE
|
|||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| MEME-TO-KATO-MEKA | PVC corner profile with mesh | m | ||||||||||
| MERI-RI-KASA-MEME | Thermal insulation boards | m3 | ||||||||||
| ME_MEKAKA_TOPU | Worker Category 1 | hrs | ||||||||||
| KAME-LI-KATO-KAME_KAKAKAME | Water | m3 | ||||||||||
| KAME-LI-KATO-KAPU_KAKAKAME | Electricity | kWh | ||||||||||
| KAME-LI-KANE-MEME_KAKAKAME | Pre-compressed self-expanding polyurethane foam sealing strips with adhesive layer on one side, width 10 mm, thickness when compressed 4 mm, thickness when expanded 20 mm | 10 m | ||||||||||
| KAME-LI-MESA-KALI_KAKAKATO | Galvanized steel dowel nails with washers for a mounting gun, diameter PU.SA mm, length 30-50 mm | 10 pcs | ||||||||||
| KAME-LI-MESA-KALI_KAMETOPU | Plastic expansion dowel nails with metal rod for thermal insulation, diameter 10 mm, length 220 mm | 10 pcs | ||||||||||
| KAME-LI-MESA-KAVO_KAKAKATO | Combined pull-through rivets (aluminum-steel), diameter TO.RI mm, length 12 mm | kg | ||||||||||
| KAME-LI-MELI-KADX_KAKANEME | Diamond ring drill bit, diameter 5 mm | pcs | ||||||||||
| KAME-VO-KAME-KANE_KAKAKAME | Fiberglass reinforcement mesh for facades, mesh size 4x4 mm, surface density 165 g/m2 | m2 | ||||||||||
| KAPU-TO-KARI-KADX_MESARINE | Dry plaster mixes, decorative, thin-layer, for exterior and interior work with a grain size of ME.SA mm | kg | ||||||||||
| KALI-RI-KANE-KANE_KAKALIPU | Aluminum base profile, width 150 mm, length 2500 mm | m | ||||||||||
| KAVO-TO-KASA-KASA_KAKASASA | Galvanized sheet steel, thickness KA.SASA mm | t | ||||||||||
| MEPU-ME-KANE-KAPU_KAKAKAME | Adhesive for bonding mineral wool | kg | ||||||||||
| MEPU-TO-KARI-KASA_KAMEKASA | Silicate paint for decorative and restoration work on exterior mineral surfaces of buildings, consumption (smooth base/rough base) KA.MERI-KA.RIKA/KA.RIKA-KA.RIVO l/m2, color white | l | ||||||||||
| MEPU-PU-KAME-MEKA_KAKAKATO | Silicate-based primer for mineral substrates before applying thin-layer silicate plaster coatings and paints | kg | ||||||||||
| MEPU-PU-KAME-MESA_KAKAKAPU | Polymer primer for acrylic and mineral plasters and before painting with acrylic and polyvinyl acetate-based paints | kg | ||||||||||
| MEPU-SA-KAME-KASA_KAKAMEME | Polyurethane foam sealant (assembly foam), universal, volume 850 ml | pcs | ||||||||||
| DXME-KANE-KATO_KASALI | Electric winches with a pulling force of MERIRI.NERI kN (MERI.SA t) | Machine hours | ||||||||||
| PU_MEKAKA_KATOKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-KANE-KATO_KASALI | Electricity: consumption KA.SATO kW·h/machine-hour | Machine hours | ||||||||||
| DXME-KANE-KASA_KANEKA | Universal front-end pneumatic wheeled single-bucket loaders, nominal capacity of main bucket KA.PUNE m3, load capacity 1 t | Machine hours | ||||||||||
| PU_MEKAKA_KAPUKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-MEPU-KARI_KAKAPU | Flatbed trucks, load capacity up to 15 t | Machine hours | ||||||||||
| PU_MEKAKA_KASAKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-RIME-RIRI_MEDXPU | Special sheet bending machines (rollers) | Machine hours | ||||||||||
| DXME-RIME-RIRI_MEDXPU | Electricity: consumption KA.RISA kW·h/machine-hour | Machine hours | ||||||||||
|
CO₂ (kg) — Zusammenfassung
|
||||||||||||
|
CO₂ (kg) wird analysiert...
|
||||||||||||
|
Reg. Price — Zusammenfassung
|
||||||||||||
|
Reg. Price wird analysiert...
|
||||||||||||
|
Alternative — Zusammenfassung
|
||||||||||||
|
Alternative wird analysiert...
|
||||||||||||
|
Optimization — Zusammenfassung
|
||||||||||||
|
Optimization wird analysiert...
|
||||||||||||
|
Where to Buy — Zusammenfassung
|
||||||||||||
|
Where to Buy wird analysiert...
|
||||||||||||
|
Safety / PPE — Zusammenfassung
|
||||||||||||
|
Safety / PPE wird analysiert...
|
||||||||||||
approx.
| kWh | ||||||
|---|---|---|---|---|---|---|
|
KI
|
- | |||||