AI
CSI
NRM2
Workers
Quick Facts
Total Cost
0
Workers/Unit
h
Labor Hours
0
Resources
0
Machines
0
Steps
KI
Work Steps
Generating image...
15-30 seconds
Error
:
|
CO₂ (kg)
|
|
Alternative
|
Optimization
|
Where to Buy
|
Safety / PPE
|
|||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| KAME-LI-MERI-KASA | Non-woven geotextiles | m2 | ||||||||||
| KAME-LI-MENE-KARI | Scaffolding | t | ||||||||||
| MEME-RI-METO-KANE | Decking boards | m2 | ||||||||||
| MERI-ME-KARI-MEKA | Waterproofing membrane, non-reinforced | m2 | ||||||||||
| RI_MEKAKA_KARI | 2nd grade worker | hrs | ||||||||||
| RI_MEKAKA_KATO | Grade 3 worker | hrs | ||||||||||
| RI_MEKAKA_KAPU | Grade 4 worker | hrs | ||||||||||
| KAME-LI-KATO-KAME_KAKAKAME | Water | m3 | ||||||||||
| KAME-LI-KATO-KAPU_KAKAKAME | Electricity | kWh | ||||||||||
| KAME-LI-KANE-KARI_KAKAKASA | Self-adhesive PVC waterproofing sealing tapes for sectioning the waterproofing of a repairable PVC membrane system, laminated on one side with a layer of geotextile, the side projections of which are designed to be glued to the base, gray in color, width excluding geotextile projections 180 mm, total width 220 mm, thickness excluding geotextile ME.LI mm, flammability group G4, ignitability group B3 | m | ||||||||||
| KAME-LI-MESA-KALI_KAKAVORI | Polypropylene anchor dowel nails with flange, diameter 6 mm, length 40 mm | 100 pcs | ||||||||||
| KAME-LI-MEDX-MEME_MEKAKAKA | Medium-density polyethylene injection tube for ground strand anchors | m | ||||||||||
| MEME-TO-KATO-MESA_MEKAKANE | PVC roundels, outer diameter 75 mm, inner diameter 25 mm, thickness 10 mm | 10 pcs | ||||||||||
| MEPU-ME-KASA-KAPU_KAMEKADX | Two-component epoxy adhesive for external reinforcement systems, thixotropic mixture of bisphenol A/F epoxy resins, active diluents, fillers, pigments, target additives (component A), aliphatic amine hardener (component B), density at 20 °C not more than ME.VOSA g/cm3, adhesion to concrete B30 not less than RI.SA MPa, color gray | kg | ||||||||||
| MEPU-SA-KADX-KADX_KAKAKARI | Technical coal tar solvent, grades A, B, C | t | ||||||||||
| RIPU-TO-KASA-MEVO_KAKAKAME | Fitting for steel pipelines, length 200 mm | pcs | ||||||||||
| DXME-KASA-KASA_KAMESA | Mobile cranes, lifting capacity 16 t | Machine hours | ||||||||||
| PU_MEKAKA_KANEKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-MEPU-KARI_KAKATO | Flatbed trucks, load capacity up to 10 tons | Machine hours | ||||||||||
| PU_MEKAKA_KAPUKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-MELI-KAPU_KAKAME | Automatic welding machines for polymer coatings, power PU.NE kW | Machine hours | ||||||||||
| DXME-MELI-KAPU_KAKAME | Electricity: consumption ME.SARI kW·h/machine-hour | Machine hours | ||||||||||
|
CO₂ (kg) — Zusammenfassung
|
||||||||||||
|
CO₂ (kg) wird analysiert...
|
||||||||||||
|
Reg. Price — Zusammenfassung
|
||||||||||||
|
Reg. Price wird analysiert...
|
||||||||||||
|
Alternative — Zusammenfassung
|
||||||||||||
|
Alternative wird analysiert...
|
||||||||||||
|
Optimization — Zusammenfassung
|
||||||||||||
|
Optimization wird analysiert...
|
||||||||||||
|
Where to Buy — Zusammenfassung
|
||||||||||||
|
Where to Buy wird analysiert...
|
||||||||||||
|
Safety / PPE — Zusammenfassung
|
||||||||||||
|
Safety / PPE wird analysiert...
|
||||||||||||
approx.
| kWh | ||||||
|---|---|---|---|---|---|---|
|
KI
|
- | |||||