AI
Workers
Use this position in your own project
The price above is a reference benchmark. OpenConstructionERP lets you reuse this position in a full project estimate — with your regional prices, quantities and margins.
KI
Work Steps
Generating image...
15-30 seconds
Error
:
|
CO₂ (kg)
|
|
Alternative
|
Optimization
|
Where to Buy
|
Safety / PPE
|
|||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| KAME-LI-KAVO-KARI | Surface-active additives | kg | ||||||||||
| KAME-LI-MENE-KAPU | Formwork inventory (depreciation) | set | ||||||||||
| KAPU-ME-KARI-KASA | Heavy concrete mixes | m3 | ||||||||||
| KAVO-PU-KATO-KARI | Hot-rolled reinforcing steel grade A-I | t | ||||||||||
| KAVO-PU-KATO-KATO | Hot-rolled reinforcing steel, class A-III | t | ||||||||||
| ME_MEKAKA_TOME | Worker Category 1 | hrs | ||||||||||
| KAME-TO-KAME-KANE_KAKASAKA | UT universal refractory grease (grease-based constalin) | t | ||||||||||
| KAME-TO-KARI-KADX_KAKARIRI | Propane-butane technical mixture | kg | ||||||||||
| KAME-LI-KATO-KAME_KAKAKAME | Water | m3 | ||||||||||
| KAME-LI-KATO-KAPU_KAKAKAME | Electricity | kWh | ||||||||||
| KAME-LI-MEME-KALI_KARIRILI | Welding electrodes for welding low-alloy and carbon steels UONI 13/45, E42A, diameter 4-5 mm | kg | ||||||||||
| KAME-LI-MEPU-KASA_KAKAKAME | Low-pressure polyethylene sheet, thickness 6 mm | m2 | ||||||||||
| KAVO-TO-KATO-KANE_KAKAKARI | Hot-rolled wire in coils, diameter NE.TO-NE.SA mm | t | ||||||||||
| KAVO-PU-KATO-KAME_KAKAMERI | Low-carbon steel reinforcing wire, class Vp-1, diameter 4-5 mm | t | ||||||||||
| MEME-ME-KATO-KAME_KAKANERI | Edged softwood beams (spruce, pine), natural moisture content, length RI-NE.SA m, width 20-90 mm, thickness 20-90 mm, grade II | m3 | ||||||||||
| RIPU-TO-KAME-KANE_KAKAPUTO | PVC pipes, nominal diameter 25 mm | m | ||||||||||
| DXME-KASA-KAME_KAMEVO | Tower cranes, lifting capacity 10 t | Machine hours | ||||||||||
| PU_MEKAKA_KANEKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-KASA-KAME_KAMEVO | Electricity: consumption LI.VOPU kWh/machine-hour | Machine hours | ||||||||||
| DXME-KANE-KASA_KAMEME | Universal front-end pneumatic wheeled single-bucket loaders, nominal capacity of main bucket RI.NE m3, load capacity 5 t | Machine hours | ||||||||||
| PU_MEKAKA_KASAKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-KALI-KAPU_KAKAME | Deep vibrators | Machine hours | ||||||||||
| DXME-MELI-KAPU_KAPURI | Gas welding and cutting equipment | Machine hours | ||||||||||
|
CO₂ (kg) — Zusammenfassung
|
||||||||||||
|
CO₂ (kg) wird analysiert...
|
||||||||||||
|
Reg. Price — Zusammenfassung
|
||||||||||||
|
Reg. Price wird analysiert...
|
||||||||||||
|
Alternative — Zusammenfassung
|
||||||||||||
|
Alternative wird analysiert...
|
||||||||||||
|
Optimization — Zusammenfassung
|
||||||||||||
|
Optimization wird analysiert...
|
||||||||||||
|
Where to Buy — Zusammenfassung
|
||||||||||||
|
Where to Buy wird analysiert...
|
||||||||||||
|
Safety / PPE — Zusammenfassung
|
||||||||||||
|
Safety / PPE wird analysiert...
|
||||||||||||
approx.
| kWh | ||||||
|---|---|---|---|---|---|---|
|
KI
|
- | |||||