AI
Workers
Use this position in your own project
The price above is a reference benchmark. OpenConstructionERP lets you reuse this position in a full project estimate — with your regional prices, quantities and margins.
KI
Work Steps
Generating image...
15-30 seconds
Error
:
|
CO₂ (kg)
|
|
Alternative
|
Optimization
|
Where to Buy
|
Safety / PPE
|
|||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| KAME-SA-KARI-KAME | Metal posts | pcs | ||||||||||
| KAME-LI-MENE-KAPU | Formwork inventory (depreciation) | set | ||||||||||
| KAPU-ME-KARI-KASA | Heavy structural concrete mixes | m3 | ||||||||||
| KAVO-PU-KATO-KATO | Periodic profile reinforcing steel | t | ||||||||||
| ME_MEKAKA_RIVO | Worker Category 1 | hrs | ||||||||||
| KAME-TO-KAPU-KAVO_KAKAMERI | Anthracene oil | t | ||||||||||
| KAME-LI-MESA-KATO_MEKAKARI | Bolts for mounting steel structures, complete with nuts and washers, diameter 24-48 mm, length 55-300 mm | kg | ||||||||||
| KAPU-TO-KAME-MERI_KAKAKATO | Masonry mortar, cement-lime, M50 | m3 | ||||||||||
| KAVO-TO-KAPU-KARI_KAKADXSA | Hot-rolled round steel bars, steel grades St3sp, St3ps, diameter 14-50 mm | t | ||||||||||
| KAVO-TO-KASA-KARI_KAKARIME | Hot-rolled sheet metal, steel grades St3sp, St3ps, width 1200-3000 mm, thickness 1-8 mm | t | ||||||||||
| KAVO-TO-KASA-KAPU_KAKARITO | Stainless steel sheet, steel grade 12X18H10T, thickness 1-3 mm | t | ||||||||||
| KAVO-TO-KAVO-KARI_KAKASAVO | Hot-rolled steel angle bar, steel grades St3sp, St3ps, shelf width 35-56 mm, shelf thickness 3-5 mm | t | ||||||||||
| MEME-ME-KATO-KASA_KAKANENE | Unedged softwood boards, natural moisture content, length RI-NE.SA m, width 100-250, thickness 30-50 mm, grade IV | m3 | ||||||||||
| MEME-ME-KATO-KASA_KAKALITO | Unedged softwood boards, natural moisture content, length RI-NE.SA m, width 100-250, thickness 20 mm, grade III | m3 | ||||||||||
| MERI-RI-KASA-KANE_KAKATORI | Expanded polystyrene thermal insulation boards, type T, PPS15 | m3 | ||||||||||
| MEPU-RI-KAPU-KATO_KAKAMESA | ED-20 epoxy resin | t | ||||||||||
| DXME-KASA-KASA_KAMESA | Mobile cranes, lifting capacity 16 t | Machine hours | ||||||||||
| PU_MEKAKA_KANEKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-KALI-KAME_KAKATO | Buckets, capacity 4 m3 | Machine hours | ||||||||||
| DXME-KALI-KAPU_KAKAME | Deep vibrators | Machine hours | ||||||||||
| DXME-MEPU-KAME_KAKATO | Concrete mixer trucks, drum capacity 6 m3 | Machine hours | ||||||||||
| PU_MEKAKA_KASAKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-MEPU-KARI_KAKAPU | Flatbed trucks, load capacity up to 15 t | Machine hours | ||||||||||
| PU_MEKAKA_KASAKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-MEVO-KAME_KAMESA | Mobile screw compressors with internal combustion engines, pressure KA.VO MPa (8 atm), capacity up to NE.TO m3/min | Machine hours | ||||||||||
| PU_MEKAKA_KAPUKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-RIME-MEKA_KAKARI | Pneumatic jackhammers powered by mobile compressors | Machine hours | ||||||||||
| DXME-RIME-MENE_KAKAME | Combined electric press shears, nominal force 630 kN, power 5 kW | Machine hours | ||||||||||
| PU_MEKAKA_KAPUKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-RIME-MENE_KAKAME | Electricity: consumption ME.SAVO kW·h/machine-hour | Machine hours | ||||||||||
| DXME-RIME-MEDX_KARIME | Rebar bending machines | Machine hours | ||||||||||
| DXME-RIME-MEDX_KARIME | Electricity: consumption KA.DXDX kWh/machine-hour | Machine hours | ||||||||||
|
CO₂ (kg) — Zusammenfassung
|
||||||||||||
|
CO₂ (kg) wird analysiert...
|
||||||||||||
|
Reg. Price — Zusammenfassung
|
||||||||||||
|
Reg. Price wird analysiert...
|
||||||||||||
|
Alternative — Zusammenfassung
|
||||||||||||
|
Alternative wird analysiert...
|
||||||||||||
|
Optimization — Zusammenfassung
|
||||||||||||
|
Optimization wird analysiert...
|
||||||||||||
|
Where to Buy — Zusammenfassung
|
||||||||||||
|
Where to Buy wird analysiert...
|
||||||||||||
|
Safety / PPE — Zusammenfassung
|
||||||||||||
|
Safety / PPE wird analysiert...
|
||||||||||||
approx.
| kWh | ||||||
|---|---|---|---|---|---|---|
|
KI
|
- | |||||