AI
CSI
NRM2
Workers
Quick Facts
Total Cost
0
Workers/Unit
h
Labor Hours
0
Resources
0
Machines
0
Steps
KI
Work Steps
Generating image...
15-30 seconds
Error
:
|
CO₂ (kg)
|
|
Alternative
|
Optimization
|
Where to Buy
|
Safety / PPE
|
|||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| ME_MEKAKA_PUTO | Worker Category 1 | hrs | ||||||||||
| KAME-ME-KARI-MEKA_MEKARIRI | Chrysotile (chrysotile asbestos), group 6K, grades 6K-45, 6K-30, 6K-20, 6K-5 | t | ||||||||||
| KAME-RI-KAME-KAME_MEKARIRI | Bitumen road oil BND 60/90 | t | ||||||||||
| KAME-TO-KAPU-KAVO_KAKAMEPU | Creosote oil | t | ||||||||||
| KAME-LI-MEME-KALI_KARIRILI | Welding electrodes for welding low-alloy and carbon steels UONI 13/45, E42A, diameter 4-5 mm | kg | ||||||||||
| KAME-LI-MEPU-KAPU_KAKAMEME | Technical polyethylene polyamine | t | ||||||||||
| KAME-LI-MEDX-KAPU_KAKAKARI | Rolled vulcanized rubber plates | kg | ||||||||||
| MEME-ME-KATO-KAME_KAKANEME | Edged coniferous timber (spruce, pine), natural moisture content, length RI-NE.SA m, width 20-90 mm, thickness 20-90 mm, grade I | m3 | ||||||||||
| MEME-ME-KATO-KASA_KAKALIPU | Unedged softwood boards, natural moisture content, length PU-NE.SA m, width 100-250, thickness 20 mm, grade IV | m3 | ||||||||||
| MEPU-ME-KASA-KASA_KAMEKATO | Resorcinol-formaldehyde adhesive, two-component, components A and B, grade FR-12 | t | ||||||||||
| MEPU-SA-KADX-KAME_KAKAKATO | Technical acetone, highest grade | kg | ||||||||||
| RISA-ME-KATO-KARI_KAKAKAME | Crutches for broad gauge railways, cross section 16x16 mm, length 165 mm | t | ||||||||||
| RISA-ME-KATO-KANE_KAKATOTO | Single-coil spring washers, type 1, hole diameter M27 | t | ||||||||||
| RISA-ME-KAPU-KAPU_KAKAKARI | Track bolts for fastening rails, diameter M24, length 140 mm, 160 mm, with nut diameter M24 | t | ||||||||||
| RINE-ME-KARI-KAPU_KAKAKARI | Steel wedge-shaped gaskets, weight up to KA.SA t | t | ||||||||||
| RINE-ME-KARI-KAPU_KAKAKASA | Polymer gasket for underlay, type "Metro" P50, dimensions 320x160 mm | pcs | ||||||||||
| DXME-KATO-MEME_KAKARI | Auxiliary transfer trolleys | Machine hours | ||||||||||
| DXME-KAVO-KAPU_KARIME | Mobile electric bitumen boilers with centrifugal mixer, loading capacity 400 l | Machine hours | ||||||||||
| DXME-KAVO-KAPU_KARIME | Electricity: consumption SA.DXPU kW·h/machine-hour | Machine hours | ||||||||||
| DXME-KADX-KARI_KAKANE | Non-tipping wagons, capacity 1 m3 | Machine hours | ||||||||||
| DXME-MELI-KAPU_RITOTO | Welding machines for manual arc welding, welding current up to 350 A | Machine hours | ||||||||||
| DXME-MELI-KAPU_RITOTO | Electricity: consumption TO.LI kWh/machine-hour | Machine hours | ||||||||||
|
CO₂ (kg) — Zusammenfassung
|
||||||||||||
|
CO₂ (kg) wird analysiert...
|
||||||||||||
|
Reg. Price — Zusammenfassung
|
||||||||||||
|
Reg. Price wird analysiert...
|
||||||||||||
|
Alternative — Zusammenfassung
|
||||||||||||
|
Alternative wird analysiert...
|
||||||||||||
|
Optimization — Zusammenfassung
|
||||||||||||
|
Optimization wird analysiert...
|
||||||||||||
|
Where to Buy — Zusammenfassung
|
||||||||||||
|
Where to Buy wird analysiert...
|
||||||||||||
|
Safety / PPE — Zusammenfassung
|
||||||||||||
|
Safety / PPE wird analysiert...
|
||||||||||||
approx.
| kWh | ||||||
|---|---|---|---|---|---|---|
|
KI
|
- | |||||