| KAPU-TO-KAME-KADX | Ready-made finishing mortar | m3 | ||||||||||
| RISA-ME-KASA-KASA | Broad gauge railway tracks, type P50 | m | ||||||||||
| ME_MEKAKA_TOPU | Worker Category 1 | hrs | ||||||||||
| KAME-TO-KAME-KAPU_MEKAKAKA | Fuel oil 100 | t | ||||||||||
| KAME-TO-KAPU-KAVO_KAKAMEPU | Creosote oil | t | ||||||||||
| KAME-LI-KATO-KAPU_KAKAKAME | Electricity | kWh | ||||||||||
| KARI-RI-KAPU-KAME_KAKAKARI | Gravel ballast | m3 | ||||||||||
| KARI-TO-KAME-KARI_MEMEMEVO | Natural sand for construction works, class II, medium | m3 | ||||||||||
| KATO-RI-KAME-KARI_KAKAMERI | Portland cement with mineral additives for general construction CEM II 32.5N | t | ||||||||||
| KASA-RI-KARI-RIPU_KAKARIME | Track cubes, concrete B15, volume KA.KAKANE m3 | m3 | ||||||||||
| MEPU-PU-KARI-KAPU_KAMEPURI | MA-0115 oil paint, mummy, iron minium | kg | ||||||||||
| RISA-ME-KAME-KASA_KAKAMEME | Coniferous wood sleeper, impregnated, for broad gauge railways, type I | pcs | ||||||||||
| RISA-ME-KAPU-KALI_KAKAKATO | Track screws with square head, diameter M24, length 170 mm | t | ||||||||||
| RINE-ME-KARI-KATO_KAKARIME | Rail fastening pad, type "Metro" P50 | pcs | ||||||||||
| RINE-ME-KARI-KASA_KAKAKAME | Contact rails for the metro | t | ||||||||||
| RINE-ME-KARI-KALI_KAKAMERI | Tunnel stop made of R-65 rails, type PP SA-RIVONE.KAME.KAKAKA | pcs | ||||||||||
| DXME-KATO-MEME_KAKARI | Auxiliary transfer trolleys | Machine hours | ||||||||||
| DXME-KASA-KASA_KAMESA | Mobile cranes, lifting capacity 16 t | Machine hours | ||||||||||
| PU_MEKAKA_KANEKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-KANE-KAME_KAKATO | Hydraulic jacks, lifting capacity 63-100 t | Machine hours | ||||||||||
| DXME-KADX-KARI_KAKANE | Non-tipping wagons, capacity 1 m3 | Machine hours | ||||||||||
| DXME-MEPU-KAPU_KAKAME | Tractor units, load on the fifth wheel coupling up to 12 t | Machine hours | ||||||||||
| PU_MEKAKA_KASAKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-MEPU-KASA_KAMERI | General purpose semi-trailers, load capacity up to 15 t | Machine hours | ||||||||||
|
CO₂ (kg) — Zusammenfassung
|
||||||||||||
|
CO₂ (kg) wird analysiert...
|
||||||||||||
|
Reg. Price — Zusammenfassung
|
||||||||||||
|
Reg. Price wird analysiert...
|
||||||||||||
|
Alternative — Zusammenfassung
|
||||||||||||
|
Alternative wird analysiert...
|
||||||||||||
|
Optimization — Zusammenfassung
|
||||||||||||
|
Optimization wird analysiert...
|
||||||||||||
|
Where to Buy — Zusammenfassung
|
||||||||||||
|
Where to Buy wird analysiert...
|
||||||||||||
|
Safety / PPE — Zusammenfassung
|
||||||||||||
|
Safety / PPE wird analysiert...
|
||||||||||||
approx.
| kWh | ||||||
|---|---|---|---|---|---|---|
|
KI
|
- | |||||