AI
Workers
Use this position in your own project
The price above is a reference benchmark. OpenConstructionERP lets you reuse this position in a full project estimate — with your regional prices, quantities and margins.
KI
Work Steps
Generating image...
15-30 seconds
Error
:
|
CO₂ (kg)
|
|
Alternative
|
Optimization
|
Where to Buy
|
Safety / PPE
|
|||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| KAME-TO-KASA-TOVO | Chemical reagents | t | ||||||||||
| KAME-PU-KATO-KANE | Drilling tool consumption | set | ||||||||||
| KAPU-ME-KARI-KASA | Heavy concrete mixes | m3 | ||||||||||
| KAVO-PU-KARI-KATO | Reinforcing frames | t | ||||||||||
| ME_MEKAKA_TOVO | Worker Category 1 | hrs | ||||||||||
| KAME-LI-KATO-KAME_KAKAKAME | Water | m3 | ||||||||||
| KARI-ME-KAME-KAME_KAKAKANE | Clay soil (clay) | m3 | ||||||||||
| KATO-RI-KAME-KAME_KAKAKAME | Portland cement without additives for general construction CEM 0 32.5N | t | ||||||||||
| KAVO-TO-KATO-KANE_KAKAKARI | Hot-rolled wire in coils, diameter NE.TO-NE.SA mm | t | ||||||||||
| MEME-ME-KATO-KAME_KAKANELI | Edged softwood timber (spruce, pine), natural moisture content, length RI-NE.SA m, width 100 mm and above, thickness 100 mm and above, grade III | m3 | ||||||||||
| RITO-TO-KAME-KAPU_KAKATOPU | Seamless casing pipes made of Group D steel, with short triangular thread, outer diameter 219 mm, wall thickness LI.LI-MEPU.RI mm | t | ||||||||||
| DXME-KAME-KASA_KAVOPU | Single-bucket diesel excavators on crawler tracks, bucket capacity KA.PU m3 | Machine hours | ||||||||||
| PU_MEKAKA_KASAKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-KARI-KAPU_KARIME | Installation for the construction of bored piles based on an excavator with a bucket capacity of RI.SA m3 for drilling wells with a diameter of up to ME.LI m | Machine hours | ||||||||||
| PU_MEKAKA_KASATO | Personnel: 3 man-hours/machine-hours | Machine hours | ||||||||||
| DXME-KARI-KAPU_KARIME | Electricity: consumption RIDX.LI kW·h/machine-hour | Machine hours | ||||||||||
| DXME-KASA-KANE_KAKALI | Crawler cranes, lifting capacity 25 t | Machine hours | ||||||||||
| PU_MEKAKA_KANEKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-KALI-KAPU_KAKAME | Deep vibrators | Machine hours | ||||||||||
| DXME-KALI-KAVO_KAMEME | Clay mixers, capacity 4 m3 | Machine hours | ||||||||||
| PU_MEKAKA_KAPUKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-KALI-KAVO_KAMEME | Electricity: consumption SA.DXPU kW·h/machine-hour | Machine hours | ||||||||||
| DXME-MEPU-KARI_KAKAME | Flatbed trucks, load capacity up to 5 tons | Machine hours | ||||||||||
| PU_MEKAKA_KAPUKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-MEDX-KANE_KAMEME | Mud pumps, capacity RITO.PU-NESA.TO m3/h, discharge pressure MESA.LI-SA.VOVO MPa (160-60 kgf/cm2) | Machine hours | ||||||||||
| DXME-MEDX-KANE_KAMEME | Electricity: consumption MEVO.MESA kWh/machine-hour | Machine hours | ||||||||||
| DXME-MEDX-KAVO_KAKADX | Pumps, capacity 50 m3/h, head 32 m, power 8 kW | Machine hours | ||||||||||
| DXME-MEDX-KAVO_KAKADX | Electricity: consumption RI.NEPU kW·h/machine-hour | Machine hours | ||||||||||
|
CO₂ (kg) — Zusammenfassung
|
||||||||||||
|
CO₂ (kg) wird analysiert...
|
||||||||||||
|
Reg. Price — Zusammenfassung
|
||||||||||||
|
Reg. Price wird analysiert...
|
||||||||||||
|
Alternative — Zusammenfassung
|
||||||||||||
|
Alternative wird analysiert...
|
||||||||||||
|
Optimization — Zusammenfassung
|
||||||||||||
|
Optimization wird analysiert...
|
||||||||||||
|
Where to Buy — Zusammenfassung
|
||||||||||||
|
Where to Buy wird analysiert...
|
||||||||||||
|
Safety / PPE — Zusammenfassung
|
||||||||||||
|
Safety / PPE wird analysiert...
|
||||||||||||
approx.
| kWh | ||||||
|---|---|---|---|---|---|---|
|
KI
|
- | |||||