AI
Workers
Use this position in your own project
The price above is a reference benchmark. OpenConstructionERP lets you reuse this position in a full project estimate — with your regional prices, quantities and margins.
KI
Work Steps
Generating image...
15-30 seconds
Error
:
|
CO₂ (kg)
|
|
Alternative
|
Optimization
|
Where to Buy
|
Safety / PPE
|
|||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| KAME-NE-KAME-MEKA | Cement-chipboard slabs, unground | m2 | ||||||||||
| MERI-RI-KASA-MEME | Thermal insulation boards | m3 | ||||||||||
| ME_MEKAKA_RIDX | Average work load RI.DX | hrs | ||||||||||
| KAME-RI-KATO-KATO_KAMERIRI | Bitumen-polymer waterproofing mastic, roofing, for building structures and roof construction (repair), cold, ready to use, temperature range from -20 to +40 °C, adhesion strength to metal/concrete not less than KA.DX/KA.NE MPa, consumption for waterproofing/roofing RI.SA-TO.SA/TO.VO-SA.LI kg/m2 with a coating thickness of 2 mm | kg | ||||||||||
| KAME-TO-KARI-KADX_KAKARIRI | Propane-butane technical mixture | kg | ||||||||||
| KAME-LI-KATO-KAPU_KAKAKAME | Electricity | kWh | ||||||||||
| KAME-LI-KANE-MEME_KAKAKAME | Pre-compressed self-expanding polyurethane foam sealing strips with adhesive layer on one side, width 10 mm, thickness when compressed 4 mm, thickness when expanded 20 mm | 10 m | ||||||||||
| KAME-LI-MESA-KATO_KAKATOME | Galvanized steel bolts with hexagonal heads and galvanized hexagonal nuts, bolt and nut thread diameter M6, bolt length 12-60 mm | kg | ||||||||||
| KAME-LI-MESA-MEPU_KATOKASA | Self-tapping galvanized steel screws with a semi-circular head and cross-shaped slot, pointed, diameter 5 mm, length 45 mm | t | ||||||||||
| KAVO-ME-KARI-RISA_KAKAPUME | Galvanized steel fixed roofing clamps, height 25 mm, thickness KA.SA mm | 100 pcs | ||||||||||
| KAVO-TO-KASA-KASA_KAKAVOME | Galvanized steel with polymer coating in rolls, zinc coating class 120-140, thickness KA.SA mm | t | ||||||||||
| KAVO-PU-KAME-KARI_KAKAKAME | Embedded parts, weight up to 1 kg | t | ||||||||||
| MERI-ME-KARI-KATO_KAMEDXNE | Rolled bitumen-polymer roofing and waterproofing material, weldable, polyester fiber base, flexibility not lower than -15 °C, strength not less than 400-600 N, heat resistance not less than 130 °C | m2 | ||||||||||
| MEPU-SA-KAPU-KASA_KAMEKAPU | Single-component construction sealing mastic, hardening | t | ||||||||||
| DXME-KASA-KAME_KAMELI | Tower cranes, lifting capacity 8 t | Machine hours | ||||||||||
| PU_MEKAKA_KANEKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-KASA-KAME_KAMELI | Electricity: consumption NE.VOTO kWh/machine-hour | Machine hours | ||||||||||
| DXME-KASA-KASA_KAMESA | Mobile cranes, lifting capacity 16 t | Machine hours | ||||||||||
| DXME-MEPU-KARI_KAKAME | Flatbed trucks, load capacity up to 5 tons | Machine hours | ||||||||||
| PU_MEKAKA_KAPUKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-RIME-MEDX_KATOLI | Seam rolling machines, power ME.ME kW | Machine hours | ||||||||||
| DXME-RIME-MEDX_KATOLI | Electricity: consumption KA.TONE kW·h/machine-hour | Machine hours | ||||||||||
|
CO₂ (kg) — Zusammenfassung
|
||||||||||||
|
CO₂ (kg) wird analysiert...
|
||||||||||||
|
Reg. Price — Zusammenfassung
|
||||||||||||
|
Reg. Price wird analysiert...
|
||||||||||||
|
Alternative — Zusammenfassung
|
||||||||||||
|
Alternative wird analysiert...
|
||||||||||||
|
Optimization — Zusammenfassung
|
||||||||||||
|
Optimization wird analysiert...
|
||||||||||||
|
Where to Buy — Zusammenfassung
|
||||||||||||
|
Where to Buy wird analysiert...
|
||||||||||||
|
Safety / PPE — Zusammenfassung
|
||||||||||||
|
Safety / PPE wird analysiert...
|
||||||||||||
approx.
| kWh | ||||||
|---|---|---|---|---|---|---|
|