| RITO-SA-KARI-KATO | Welded tubular sheet pile made of electric welded pipes | t | ||||||||||
| ME_MEKAKA_TODX | Worker Category 1 | hrs | ||||||||||
| KAME-TO-KARI-KATO_KAKAKAME | Acetylene gas, technical grade | m3 | ||||||||||
| KAME-TO-KARI-KAVO_KAKAKAME | Technical gaseous oxygen | m3 | ||||||||||
| KAME-LI-MEME-KALI_KARITOKA | Welding electrodes for welding low-alloy and carbon steels UONI 13/55, E50A, diameter 4-5 mm | kg | ||||||||||
| KALI-RI-KALI-KAPU_KAKAKALI | Custom-made steel structures from rolled steel | t | ||||||||||
| KALI-RI-KALI-MERI_KAKAKAME | Auxiliary metal structures predominantly made of thick-gauge steel or rolled sections, with or without holes | t | ||||||||||
| KAVO-TO-KASA-KARI_KAKAKAME | Hot-rolled sheet metal, steel grades St3sp, St3ps, width 1200-3000 mm, thickness 9-12 mm | t | ||||||||||
| KAVO-TO-MEME-KAME_MEMEKAPU | Hot-rolled steel channels, steel grades St3ps, St3sp, No. 27U-30U, No. 27P-30P | t | ||||||||||
| MEME-ME-KATO-KAME_KAKANEPU | Edged coniferous timber (spruce, pine), natural moisture content, length RI-NE.SA m, width 20-90 mm, thickness 20-90 mm, grade IV | m3 | ||||||||||
| MEME-ME-KATO-KANE_KAKAKARI | Edged oak boards, length 2-4 m, width 100-300 mm, thickness 30 mm, grade II | m3 | ||||||||||
| MEPU-PU-KAME-KADX_KAPURILI | Epoxy anti-corrosion primer with zinc content for protecting metal surfaces, consumption KA.RIKA-KA.TODX kg/m2 | kg | ||||||||||
| MEPU-PU-KAME-MEDX_KAKAKARI | Primer HS-010 | t | ||||||||||
| MEPU-PU-KATO-METO_KAKAKARI | HV-784 varnish | t | ||||||||||
| DXME-KARI-KARI_KAKAME | Tractor-based copra installations, power up to 110 kW (150 hp) | Machine hours | ||||||||||
| PU_MEKAKA_KALIKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-KARI-KATO_KARIPU | Diesel hammers, impact weight RI.SA t | Machine hours | ||||||||||
| DXME-KASA-KASA_KAMESA | Mobile cranes, lifting capacity 16 t | Machine hours | ||||||||||
| PU_MEKAKA_KANEKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-MEPU-KAPU_KAKAME | Tractor units, load on the fifth wheel coupling up to 12 t | Machine hours | ||||||||||
| PU_MEKAKA_KASAKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-MEPU-KASA_KAMERI | General purpose semi-trailers, load capacity up to 15 t | Machine hours | ||||||||||
| DXME-MELI-KAPU_KATOPU | Welding units with internal combustion engines for manual arc welding, welding current up to 400 A, number of stations 1 | Machine hours | ||||||||||
| DXME-MELI-KAPU_KAPURI | Gas welding and cutting equipment | Machine hours | ||||||||||
| DXME-RIKA-KARI_KAKASA | Non-self-propelled barges, load capacity 600 tons | Machine hours | ||||||||||
| PU_MEKAKA_KANEKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-RIKA-KATO_KAKARI | Tugs, power 221 kW (300 hp) | Machine hours | ||||||||||
| PU_MEKAKA_KASAKA | Personnel: 3 man-hours/machine-hours | Machine hours | ||||||||||
| DXME-RIKA-KADX_KAKATO | Non-self-propelled floating cranes, 25 tons | Machine hours | ||||||||||
| PU_MEKAKA_KANEPU | Personnel: 7 man-hours/machine-hours | Machine hours | ||||||||||
|
CO₂ (kg) — Zusammenfassung
|
||||||||||||
|
CO₂ (kg) wird analysiert...
|
||||||||||||
|
Reg. Price — Zusammenfassung
|
||||||||||||
|
Reg. Price wird analysiert...
|
||||||||||||
|
Alternative — Zusammenfassung
|
||||||||||||
|
Alternative wird analysiert...
|
||||||||||||
|
Optimization — Zusammenfassung
|
||||||||||||
|
Optimization wird analysiert...
|
||||||||||||
|
Where to Buy — Zusammenfassung
|
||||||||||||
|
Where to Buy wird analysiert...
|
||||||||||||
|
Safety / PPE — Zusammenfassung
|
||||||||||||
|
Safety / PPE wird analysiert...
|
||||||||||||
approx.
| kWh | ||||||
|---|---|---|---|---|---|---|
|
KI
|
- | |||||