AI
Workers
Use this position in your own project
The price above is a reference benchmark. OpenConstructionERP lets you reuse this position in a full project estimate — with your regional prices, quantities and margins.
KI
Work Steps
Generating image...
15-30 seconds
Error
:
|
CO₂ (kg)
|
|
Alternative
|
Optimization
|
Where to Buy
|
Safety / PPE
|
|||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| KASA-ME-KARI-KALI | Reinforced concrete support stand | pcs | ||||||||||
| KASA-ME-KASA-METO | Reinforced concrete foundations for contact network supports | pcs | ||||||||||
| RISA-ME-KANE-KATO | Railway track and signal signs | 100 pcs | ||||||||||
| ME_MEKAKA_TORI | Worker Category 1 | hrs | ||||||||||
| KAME-RI-KAME-KARI_KAKASAPU | BN-90/10 petroleum bitumen for construction | t | ||||||||||
| KAPU-TO-KAME-KADX_KAKAMEPU | Ready-mixed masonry mortar, cement, M100 | m3 | ||||||||||
| KAVO-TO-KATO-KANE_KAKAKARI | Hot-rolled wire in coils, diameter NE.TO-NE.SA mm | t | ||||||||||
| MEME-ME-KARI-KAPU_KAKATOME | Round coniferous timber, unpeeled, length TO-NE.SA m, diameter 14-24 cm, grade II-III | m3 | ||||||||||
| MEME-ME-KATO-KAME_KAKANERI | Edged softwood beams (spruce, pine), natural moisture content, length RI-NE.SA m, width 20-90 mm, thickness 20-90 mm, grade II | m3 | ||||||||||
| MEME-ME-KATO-KANE_KAKAMETO | Edged hardwood boards (birch), natural moisture content, length RI-NE.SA m, all widths, thickness 20-22 mm, grade III | m3 | ||||||||||
| DXME-KASA-KALI_KAKARI | Railway cranes, lifting capacity 16 t | Machine hours | ||||||||||
| PU_MEKAKA_KASASA | Personnel: 2 man-hours/machine-hour | Machine hours | ||||||||||
| DXME-KADX-KATO_KARIPU | 20-ton wide gauge railcars | Machine hours | ||||||||||
| DXME-KADX-KATO_KATOSA | Wide gauge platforms, load capacity 73 t | Machine hours | ||||||||||
| DXME-KADX-KASA_KARIRI | Broad gauge shunting locomotives, power 550 kW (750 hp) | Machine hours | ||||||||||
| PU_MEKAKA_KASAKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-KADX-MEME_KAKAME | Vibratory pile driving units for catenary network support foundations (without motor-electric power station) | Machine hours | ||||||||||
| PU_MEKAKA_KANEKA | Personnel: 2 man-hours/machine-hour | Machine hours | ||||||||||
| DXME-KADX-MEME_KARIRI | Machines for digging pits for contact network supports when working "from the track" | Machine hours | ||||||||||
| PU_MEKAKA_KASASA | Personnel: 2 man-hours/machine-hour | Machine hours | ||||||||||
| DXME-KADX-METO_KARIME | Motor-generator units | Machine hours | ||||||||||
| PU_MEKAKA_KASAKA | Personnel: 2 man-hours/machine-hour | Machine hours | ||||||||||
|
CO₂ (kg) — Zusammenfassung
|
||||||||||||
|
CO₂ (kg) wird analysiert...
|
||||||||||||
|
Reg. Price — Zusammenfassung
|
||||||||||||
|
Reg. Price wird analysiert...
|
||||||||||||
|
Alternative — Zusammenfassung
|
||||||||||||
|
Alternative wird analysiert...
|
||||||||||||
|
Optimization — Zusammenfassung
|
||||||||||||
|
Optimization wird analysiert...
|
||||||||||||
|
Where to Buy — Zusammenfassung
|
||||||||||||
|
Where to Buy wird analysiert...
|
||||||||||||
|
Safety / PPE — Zusammenfassung
|
||||||||||||
|
Safety / PPE wird analysiert...
|
||||||||||||
approx.
| kWh | ||||||
|---|---|---|---|---|---|---|
|
KI
|
- | |||||