AI
Workers
Use this position in your own project
The price above is a reference benchmark. OpenConstructionERP lets you reuse this position in a full project estimate — with your regional prices, quantities and margins.
KI
Work Steps
Generating image...
15-30 seconds
Error
:
|
CO₂ (kg)
|
|
Alternative
|
Optimization
|
Where to Buy
|
Safety / PPE
|
|||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| MEME-ME-KATO-KAME | Edged coniferous timber (spruce, pine), natural moisture content, length RI-NE.SA m, width 20-90 mm, thickness 20-90 mm | m3 | ||||||||||
| MEPU-PU-KAME-MESA | Primer | t | ||||||||||
| ME_MEKAKA_TOPU | Worker Category 1 | hrs | ||||||||||
| KAME-NE-KAME-KASA_KAKAKARI | Reinforced cement-mineral exterior slabs, thickness MERI.SA mm | m2 | ||||||||||
| KAME-LI-KATO-KAPU_KAKAKAME | Electricity | kWh | ||||||||||
| KAME-LI-KANE-KAME_KAKAPUME | Elastic self-adhesive tapes for guide profiles 30x30000 mm | m | ||||||||||
| KAME-LI-KANE-KAPU_KAKAKAME | Alkali-resistant glass fiber reinforcement tape, width 100 mm, length 50000 mm | pcs | ||||||||||
| KAME-LI-MESA-KALI_KAKAMERI | Plastic dowels with screws, diameter 12 mm, length 70 mm, screw diameter 8 mm, screw length 70 mm | 100 pcs | ||||||||||
| KAME-LI-MESA-MEPU_KAKATOPU | Self-tapping steel screws with anti-corrosion coating, countersunk head and cross-shaped slot, double-start thread, pointed tip, diameter PU.RI mm, length 39 mm | 1000 pcs | ||||||||||
| KAME-LI-MESA-MEPU_KAKAPULI | Self-tapping steel screws, oxidized, with countersunk head and cross-shaped slot, pointed, diameter PU.RI mm, length 75 mm | 100 pcs | ||||||||||
| KAME-VO-KAME-KANE_KAKAKAME | Fiberglass reinforcement mesh for facades, mesh size 4x4 mm, surface density 165 g/m2 | m2 | ||||||||||
| KAPU-TO-KARI-KADX_MEKAKASA | Cement-based dry putty mixes for continuous thin-layer puttying of panel cladding, white color | kg | ||||||||||
| KAPU-TO-KARI-KADX_MEKAKANE | Dry concrete mixes, non-shrinking, fast-setting, containing polymer and rigid steel fibers, for repairing concrete and reinforced concrete elements of bridge structures, airfield and road pavements subject to dynamic and impact loads, aggregate size 10 mm | kg | ||||||||||
|
CO₂ (kg) — Zusammenfassung
|
||||||||||||
|
CO₂ (kg) wird analysiert...
|
||||||||||||
|
Reg. Price — Zusammenfassung
|
||||||||||||
|
Reg. Price wird analysiert...
|
||||||||||||
|
Alternative — Zusammenfassung
|
||||||||||||
|
Alternative wird analysiert...
|
||||||||||||
|
Optimization — Zusammenfassung
|
||||||||||||
|
Optimization wird analysiert...
|
||||||||||||
|
Where to Buy — Zusammenfassung
|
||||||||||||
|
Where to Buy wird analysiert...
|
||||||||||||
|
Safety / PPE — Zusammenfassung
|
||||||||||||
|
Safety / PPE wird analysiert...
|
||||||||||||
approx.
| kWh | ||||||
|---|---|---|---|---|---|---|
|
KI
|
- | |||||