Workers

Use this position in your own project

The price above is a reference benchmark. OpenConstructionERP lets you reuse this position in a full project estimate — with your regional prices, quantities and margins.

Open this position in OpenConstructionERP

Export & Share

Free
  • 15
Pro 9,90

PayPal
Installation of temporary support made of metal arches on rods in vertical shaft connections with cross-sectional areas ranging from 22 to 25 m2, rock strength coefficient: 7-9

QR Code & Share

Scan QR code or share link

Share via

Zur Kalkulation hinzufügen

/