AI
Workers
KI
Work Steps
Generating image...
15-30 seconds
Error
:
|
CO₂ (kg)
|
|
Alternative
|
Optimization
|
Where to Buy
|
Safety / PPE
|
|||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| KALI-TO-KATO-MERI | Upper guide pipe | pcs | ||||||||||
| RI_MEKAKA_KASA | Grade 5 worker | hrs | ||||||||||
| RI_MEKAKA_KAPU | Grade 4 worker | hrs | ||||||||||
| RI_MEKAKA_KANE | Grade 6 worker | hrs | ||||||||||
| KAME-LI-KATO-KAPU_KAKAKAME | Electricity | kWh | ||||||||||
| KAME-LI-KANE-KATO_KAKARIRI | Polyethylene tape with adhesive layer, transparent, width 50 mm, thickness KA.KAVO mm | m | ||||||||||
| KAME-LI-MEME-KALI_KARITOKA | Welding electrodes for welding low-alloy and carbon steels UONI 13/55, E50A, diameter 4-5 mm | kg | ||||||||||
| KAME-LI-MELI-KALI_KAKASARI | Straight profile grinding wheel, grinding material grade 25A, dimensions 150x20x32 mm | pcs | ||||||||||
| MERI-RI-KATO-MEME_KAKARITO | T-11 structural glass fabric | m2 | ||||||||||
| MELI-ME-KARI-KASA_KAKASAKA | Ceramic backing on aluminum self-adhesive film for welding, backing width 85 mm, backing length 600 mm, rod diameter 9 mm | kg | ||||||||||
| DXME-KASA-KAME_KARIME | Tower cranes, lifting capacity 40 t | Machine hours | ||||||||||
| PU_MEKAKA_KAVOKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-KASA-KAME_KARIME | Electricity: consumption MEME.RI kW·h/machine-hour | Machine hours | ||||||||||
| DXME-KANE-KALI_KAKAME | Manual lever hoists | Machine hours | ||||||||||
| DXME-MELI-KAME_KAKAPU | Welding rectifiers, welding current up to 500 A, number of posts 1 | Machine hours | ||||||||||
| DXME-MELI-KAME_KAKAPU | Electricity: consumption LI.DXRI kW·h/machine-hour | Machine hours | ||||||||||
|
CO₂ (kg) — Zusammenfassung
|
||||||||||||
|
CO₂ (kg) wird analysiert...
|
||||||||||||
|
Reg. Price — Zusammenfassung
|
||||||||||||
|
Reg. Price wird analysiert...
|
||||||||||||
|
Alternative — Zusammenfassung
|
||||||||||||
|
Alternative wird analysiert...
|
||||||||||||
|
Optimization — Zusammenfassung
|
||||||||||||
|
Optimization wird analysiert...
|
||||||||||||
|
Where to Buy — Zusammenfassung
|
||||||||||||
|
Where to Buy wird analysiert...
|
||||||||||||
|
Safety / PPE — Zusammenfassung
|
||||||||||||
|
Safety / PPE wird analysiert...
|
||||||||||||
approx.
| kWh | ||||||
|---|---|---|---|---|---|---|
|
KI
|
- | |||||