AI
Workers
Use this position in your own project
The price above is a reference benchmark. OpenConstructionERP lets you reuse this position in a full project estimate — with your regional prices, quantities and margins.
KI
Work Steps
Generating image...
15-30 seconds
Error
:
|
CO₂ (kg)
|
|
Alternative
|
Optimization
|
Where to Buy
|
Safety / PPE
|
|||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| ME_MEKAKA_PUSA | Worker Category 1 | hrs | ||||||||||
| KAME-RI-KAME-KARI_KAKATOME | Bitumen petroleum construction insulation BNI-IV-3, BNI-IV, BNI-V | t | ||||||||||
| KAME-TO-KASA-MELI_KAKAKARI | Pine rosin | kg | ||||||||||
| KAME-TO-KASA-TOVO_KATOLIME | Technical stearic acid | kg | ||||||||||
| KAME-LI-MESA-KATO_KAKAPURI | Bolts with nuts and washers for construction | kg | ||||||||||
| KATO-RI-KAME-KAME_KAKAKAME | Portland cement without additives for general construction CEM 0 32.5N | t | ||||||||||
| KAPU-ME-KARI-KASA_KAMERIRI | Heavy concrete mixes (BST) on gravel aggregate, class B12.5, F(1)75, W2 | m3 | ||||||||||
| KAVO-TO-KASA-KARI_KAKARIME | Hot-rolled sheet metal, steel grades St3sp, St3ps, width 1200-3000 mm, thickness 1-8 mm | t | ||||||||||
| MEKA-TO-KARI-KATO_KAKARIPU | Low-antimony tin-lead solders, POSSu PUKA-KA.SA grade | kg | ||||||||||
| MEKA-TO-KARI-KATO_KAKATONE | Tin-lead antimony solders, POSSu 30-2 grade | kg | ||||||||||
| MEPU-PU-KATO-KAPU_KAKAKAME | Coal tar varnish, grade A | t | ||||||||||
| MEPU-SA-KADX-MEME_KAKAKAME | Nepras C4-150/200 | t | ||||||||||
| RIKA-RI-KADX-KAME_KAKARIME | Filling compound for MKS-M communication cables | kg | ||||||||||
| RIME-RI-KATO-KARI_KAKAKATO | MGSHVE installation wire 2x0.50-1000 | 1000 m | ||||||||||
| RIRI-ME-KAME-KAME_KAKATOTO | Cable box, type BM2-3 | pcs | ||||||||||
| RIRI-RI-KARI-RITO_KAKAKARI | Steel bushings, diameter 65 mm, length 50 mm | t | ||||||||||
|
CO₂ (kg) — Zusammenfassung
|
||||||||||||
|
CO₂ (kg) wird analysiert...
|
||||||||||||
|
Reg. Price — Zusammenfassung
|
||||||||||||
|
Reg. Price wird analysiert...
|
||||||||||||
|
Alternative — Zusammenfassung
|
||||||||||||
|
Alternative wird analysiert...
|
||||||||||||
|
Optimization — Zusammenfassung
|
||||||||||||
|
Optimization wird analysiert...
|
||||||||||||
|
Where to Buy — Zusammenfassung
|
||||||||||||
|
Where to Buy wird analysiert...
|
||||||||||||
|
Safety / PPE — Zusammenfassung
|
||||||||||||
|
Safety / PPE wird analysiert...
|
||||||||||||
approx.
| kWh | ||||||
|---|---|---|---|---|---|---|
|
KI
|
- | |||||