Workers

Use this position in your own project

The price above is a reference benchmark. OpenConstructionERP lets you reuse this position in a full project estimate — with your regional prices, quantities and margins.

Open this position in OpenConstructionERP

Export & Share

Free
  • 15
Pro 9,90

PayPal
Layer-by-layer development of chamber cores with soil transfer to the lower horizon at a layer height of up to 3 m in soils of group: 8

QR Code & Share

Scan QR code or share link

Share via

Zur Kalkulation hinzufügen

/