The price above is a reference benchmark. OpenConstructionERP lets you reuse this position in a full project estimate — with your regional prices, quantities and margins.
KI
Work Steps
Generating image...
15-30 seconds
Error
:
|
CO₂ (kg)
|
|
Alternative
|
Optimization
|
Where to Buy
|
Safety / PPE
|
|||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| KAPU-TO-KAME-KADX | Ready-mixed heavy cement mortar | m3 | ||||||||||
| ME_MEKAKA_TOKA | Average workload TO.KA | hrs | ||||||||||
| KAME-TO-KASA-RITO_KAMERIDX | Technical sodium fluoride, grade A, type I | t | ||||||||||
| KAME-LI-KATO-KAME_KAKAKAME | Water | m3 | ||||||||||
| KAME-LI-KATO-KAPU_KAKAKAME | Electricity | kWh | ||||||||||
| KAME-LI-MESA-KANE_KAMERIRI | Steel construction nails, diameter ME.VO mm, length 50-60 mm | t | ||||||||||
| KANE-ME-KAME-KASA_KAKATOSA | Single solid ceramic brick, dimensions 250x120x65 mm, grade M100 | 1000 pcs | ||||||||||
| MEME-ME-KAME-KADX_KAKAKARI | Larch joists for flooring, antiseptic treated, thickness 40-60 mm, width 100-150 mm | m3 | ||||||||||
| MEME-ME-KATO-KANE_KAKALIME | Edged softwood board, natural moisture content, length RI-NE.SA m, width 100-250 mm, thickness 25 mm, grade III | m3 | ||||||||||
| MERI-ME-KARI-KANE_KAKAMERI | RKK-350 roofing felt | m2 | ||||||||||
| DXME-KANE-KASA_KAMEME | Universal front-end pneumatic wheeled single-bucket loaders, nominal capacity of main bucket RI.NE m3, load capacity 5 t | Machine hours | ||||||||||
| PU_MEKAKA_KASAKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-KANE-KANE_KAPUVO | Single-mast hoists, load capacity up to 500 kg, lifting height 45 m | Machine hours | ||||||||||
| PU_MEKAKA_KATOKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-MEPU-KARI_KAKAME | Flatbed trucks, load capacity up to 5 tons | Machine hours | ||||||||||
| PU_MEKAKA_KAPUKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
|
CO₂ (kg) — Zusammenfassung
|
||||||||||||
|
CO₂ (kg) wird analysiert...
|
||||||||||||
|
Reg. Price — Zusammenfassung
|
||||||||||||
|
Reg. Price wird analysiert...
|
||||||||||||
|
Alternative — Zusammenfassung
|
||||||||||||
|
Alternative wird analysiert...
|
||||||||||||
|
Optimization — Zusammenfassung
|
||||||||||||
|
Optimization wird analysiert...
|
||||||||||||
|
Where to Buy — Zusammenfassung
|
||||||||||||
|
Where to Buy wird analysiert...
|
||||||||||||
|
Safety / PPE — Zusammenfassung
|
||||||||||||
|
Safety / PPE wird analysiert...
|
||||||||||||
approx.
| kWh | ||||||
|---|---|---|---|---|---|---|
|
KI
|
- | |||||