AI
Workers
Use this position in your own project
The price above is a reference benchmark. OpenConstructionERP lets you reuse this position in a full project estimate — with your regional prices, quantities and margins.
KI
Work Steps
Generating image...
15-30 seconds
Error
:
|
CO₂ (kg)
|
|
Alternative
|
Optimization
|
Where to Buy
|
Safety / PPE
|
|||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| KASA-ME-KATO-METO | Precast reinforced concrete structures | pcs | ||||||||||
| ME_MEKAKA_PURI | Worker Category 1 | hrs | ||||||||||
| KAME-LI-MEME-KALI_KAKATODX | Welding electrodes for welding low-alloy and carbon steels E50, diameter 4 mm | kg | ||||||||||
| KAPU-TO-KAME-KADX_KAKAMEPU | Ready-mixed masonry mortar, cement, M100 | m3 | ||||||||||
| KALI-RI-KALI-MERI_KAKAKAME | Auxiliary metal structures predominantly made of thick-gauge steel or rolled sections, with or without holes | t | ||||||||||
| KAVO-ME-KARI-MELI_KAKATOLI | Single woven steel mesh made of galvanized wire with square cells, wire diameter ME.VO mm, cell size 50x50 mm | m2 | ||||||||||
| KAVO-TO-KATO-KAPU_KAKAMERI | Light wire, diameter ME.ME mm | t | ||||||||||
| KAVO-TO-KAPU-KARI_KAKAKATO | Hot-rolled round steel bar, steel grades St3sp, St3ps, diameter 52-70 mm | t | ||||||||||
| MEPU-PU-KARI-KAPU_KAMEVORI | MA-15 oil paint, colored | t | ||||||||||
| DXME-KASA-KAME_KAMELI | Tower cranes, lifting capacity 8 t | Machine hours | ||||||||||
| PU_MEKAKA_KANEKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-KASA-KAME_KAMELI | Electricity: consumption NE.VOTO kWh/machine-hour | Machine hours | ||||||||||
| DXME-MEPU-KARI_KAKAME | Flatbed trucks, load capacity up to 5 tons | Machine hours | ||||||||||
| PU_MEKAKA_KAPUKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-MELI-KAPU_RITOTO | Welding machines for manual arc welding, welding current up to 350 A | Machine hours | ||||||||||
| DXME-MELI-KAPU_RITOTO | Electricity: consumption TO.LI kWh/machine-hour | Machine hours | ||||||||||
|
CO₂ (kg) — Zusammenfassung
|
||||||||||||
|
CO₂ (kg) wird analysiert...
|
||||||||||||
|
Reg. Price — Zusammenfassung
|
||||||||||||
|
Reg. Price wird analysiert...
|
||||||||||||
|
Alternative — Zusammenfassung
|
||||||||||||
|
Alternative wird analysiert...
|
||||||||||||
|
Optimization — Zusammenfassung
|
||||||||||||
|
Optimization wird analysiert...
|
||||||||||||
|
Where to Buy — Zusammenfassung
|
||||||||||||
|
Where to Buy wird analysiert...
|
||||||||||||
|
Safety / PPE — Zusammenfassung
|
||||||||||||
|
Safety / PPE wird analysiert...
|
||||||||||||
approx.
| kWh | ||||||
|---|---|---|---|---|---|---|
|
KI
|
- | |||||