AI
CSI
NRM2
Workers
Quick Facts
Total Cost
0
Workers/Unit
h
Labor Hours
0
Resources
0
Machines
0
Steps
KI
Work Steps
Generating image...
15-30 seconds
Error
:
|
CO₂ (kg)
|
|
Alternative
|
Optimization
|
Where to Buy
|
Safety / PPE
|
|||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| KASA-ME-KAVO-MEPU | Head shells | pcs | ||||||||||
| ME_MEKAKA_TORI | Worker Category 1 | hrs | ||||||||||
| KAME-TO-KAME-KAME_KAKAKARI | AI-98, AI-95 automotive gasoline | t | ||||||||||
| KAME-LI-MESA-KATO_KAKAPURI | Bolts with nuts and washers for construction | kg | ||||||||||
| KAVO-ME-KARI-MEME_KAKAKAME | Forgings from square billets, weight ME.SA-PU.SA kg | t | ||||||||||
| KAVO-RI-KARI-KASA_KAKAPUTO | Double-twisted rope LK-R, construction 6x19(1+6+6/6)+1 o.s., grade B, made of uncoated wire, marking group 1570-1770 N/mm2, diameter 15 mm | 10 m | ||||||||||
| MEME-ME-KARI-KAPU_KAKATOME | Round coniferous timber, unpeeled, length TO-NE.SA m, diameter 14-24 cm, grade II-III | m3 | ||||||||||
| DXME-MEDX-MERI_KATOME | Water drainage pump units with internal combustion engine, flow rate 400 m3/h | Machine hours | ||||||||||
| PU_MEKAKA_KARIKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-RIKA-KARI_KAMEKA | Non-self-propelled barges operating in open waters, lifting capacity 250 t | Machine hours | ||||||||||
| PU_MEKAKA_MEKAKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-RIKA-KATO_KAKADX | Diesel tugs operating in open waters, power 294 kW (400 hp) | Machine hours | ||||||||||
| PU_MEKAKA_KANEKA | Personnel: 4 man-hours/machine-hours | Machine hours | ||||||||||
| DXME-RIKA-KADX_KAKADX | Floating cranes for working in open waters, self-propelled, 16 t | Machine hours | ||||||||||
| PU_MEKAKA_KANEPU | Personnel: 7 man-hours/machine-hours | Machine hours | ||||||||||
| DXME-RIKA-METO_KAKATO | Diving stations on a self-propelled boat with a compressor for operation in open water, power 110 kW (150 hp) | Machine hours | ||||||||||
| PU_MEKAKA_MEKAKA | Personnel: 6 people-hours/machine-hours | Machine hours | ||||||||||
|
CO₂ (kg) — Zusammenfassung
|
||||||||||||
|
CO₂ (kg) wird analysiert...
|
||||||||||||
|
Reg. Price — Zusammenfassung
|
||||||||||||
|
Reg. Price wird analysiert...
|
||||||||||||
|
Alternative — Zusammenfassung
|
||||||||||||
|
Alternative wird analysiert...
|
||||||||||||
|
Optimization — Zusammenfassung
|
||||||||||||
|
Optimization wird analysiert...
|
||||||||||||
|
Where to Buy — Zusammenfassung
|
||||||||||||
|
Where to Buy wird analysiert...
|
||||||||||||
|
Safety / PPE — Zusammenfassung
|
||||||||||||
|
Safety / PPE wird analysiert...
|
||||||||||||
approx.
| kWh | ||||||
|---|---|---|---|---|---|---|
|
KI
|
- | |||||