AI
Workers
Use this position in your own project
The price above is a reference benchmark. OpenConstructionERP lets you reuse this position in a full project estimate — with your regional prices, quantities and margins.
KI
Work Steps
Generating image...
15-30 seconds
Error
:
|
CO₂ (kg)
|
|
Alternative
|
Optimization
|
Where to Buy
|
Safety / PPE
|
|||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| ME_MEKAKA_PUSA | Worker Category 1 | hrs | ||||||||||
| KAME-TO-KARI-KAVO_KAKAKAME | Technical gaseous oxygen | m3 | ||||||||||
| KAME-TO-KARI-KADX_KAKARIRI | Propane-butane technical mixture | kg | ||||||||||
| KAME-TO-KATO-KAPU_KAKAKATO | Technical orthophosphoric acid | kg | ||||||||||
| KAME-TO-KATO-KANE_KAKAKATO | Technical hydrochloric acid | kg | ||||||||||
| KAME-TO-KASA-RITO_KAKANEME | Caustic soda, grade TD, technical | t | ||||||||||
| KAME-LI-KARI-KALI_KAKAMEME | Pressboard, grade A | kg | ||||||||||
| KAME-LI-MEKA-KASA_KAKAKAME | Ground coke | t | ||||||||||
| KAME-LI-MEME-KALI_KARIPUNE | Welding electrodes for welding heat-resistant austenitic and high-strength structural steels EA-395, diameter 2-5 mm | kg | ||||||||||
| KAVO-TO-KATO-KAPU_KAKAPUTO | Black wire, diameter ME.KA-ME.ME mm | t | ||||||||||
| RIME-ME-KASA-KAME_KAKAPUME | Flexible power cable with copper conductors KG 3x6-660 | 1000 m | ||||||||||
| RIME-RI-KARI-KAME_KAKARITO | MG antenna wire, cross-section 4 mm2 | 1000 m | ||||||||||
| RIME-RI-KATO-KASA_KAKAKARI | Power installation wire APuV 1x2.5-450 | 1000 m | ||||||||||
| DXME-KASA-KAPU_KAKASA | Electric overhead cranes, lifting capacity 5 t | Machine hours | ||||||||||
| PU_MEKAKA_KAPUKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-KASA-KAPU_KAKASA | Electricity: consumption RI.DXLI kW·h/machine-hour | Machine hours | ||||||||||
| DXME-KASA-KASA_KAMESA | Mobile cranes, lifting capacity 16 t | Machine hours | ||||||||||
| PU_MEKAKA_KANEKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-KANE-KATO_KANERI | Electric winches with pulling force up to TOME.TODX kN (TO.RI t) | Machine hours | ||||||||||
| DXME-KANE-KATO_KANERI | Electricity: consumption KA.TODX kW·h/machine-hour | Machine hours | ||||||||||
| DXME-MELI-KAPU_RITOTO | Welding machines for manual arc welding, welding current up to 350 A | Machine hours | ||||||||||
| DXME-MELI-KAPU_RITOTO | Electricity: consumption TO.LI kWh/machine-hour | Machine hours | ||||||||||
| DXME-MEVO-KAME_KAKALI | Mobile screw compressors with internal combustion engines, pressure up to KA.LI MPa (7 atm), capacity up to SA.PU m3/min | Machine hours | ||||||||||
| PU_MEKAKA_KAPUKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-RIME-MEDX_KAMENE | Pipe bending machines complete with mandrel for cold bending of pipes with an outer diameter of 508-1020 mm | Machine hours | ||||||||||
| PU_MEKAKA_KASAKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-RIME-MEDX_KAMENE | Electricity: consumption MEVO.MESA kWh/machine-hour | Machine hours | ||||||||||
| DXME-RIME-MEDX_KATOME | Drilling machines | Machine hours | ||||||||||
| DXME-RIME-MEDX_KATOME | Electricity: consumption KA.PUSA kW·h/machine-hour | Machine hours | ||||||||||
| DXME-RIME-MEDX_KATOTO | Turning and screw-cutting machines | Machine hours | ||||||||||
| PU_MEKAKA_KASAKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-RIME-MEDX_KATOTO | Electricity: consumption RI.SARI kW·h/machine-hour | Machine hours | ||||||||||
| DXME-RIME-MEDX_KATONE | Pipe cutting machines, maximum pipe diameter 426 mm | Machine hours | ||||||||||
| PU_MEKAKA_KAPUKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-RIME-MEDX_KATONE | Electricity: consumption ME.VORI kW·h/machine-hour | Machine hours | ||||||||||
|
CO₂ (kg) — Zusammenfassung
|
||||||||||||
|
CO₂ (kg) wird analysiert...
|
||||||||||||
|
Reg. Price — Zusammenfassung
|
||||||||||||
|
Reg. Price wird analysiert...
|
||||||||||||
|
Alternative — Zusammenfassung
|
||||||||||||
|
Alternative wird analysiert...
|
||||||||||||
|
Optimization — Zusammenfassung
|
||||||||||||
|
Optimization wird analysiert...
|
||||||||||||
|
Where to Buy — Zusammenfassung
|
||||||||||||
|
Where to Buy wird analysiert...
|
||||||||||||
|
Safety / PPE — Zusammenfassung
|
||||||||||||
|
Safety / PPE wird analysiert...
|
||||||||||||
approx.
| kWh | ||||||
|---|---|---|---|---|---|---|
|
KI
|
- | |||||