Workers

Use this position in your own project

The price above is a reference benchmark. OpenConstructionERP lets you reuse this position in a full project estimate — with your regional prices, quantities and margins.

Continue in OpenConstructionERP

Export & Share

Free
  • 15
Pro 9,90

PayPal
Maximum current protection with single-shot automatic reclosing: and synchronism check, connected to the sum of the currents of two parallel lines EPZ-1658

QR Code & Share

Scan QR code or share link

Share via

Zur Kalkulation hinzufügen

/