AI
Workers
Use this position in your own project
The price above is a reference benchmark. OpenConstructionERP lets you reuse this position in a full project estimate — with your regional prices, quantities and margins.
KI
Work Steps
Generating image...
15-30 seconds
Error
:
|
CO₂ (kg)
|
|
Alternative
|
Optimization
|
Where to Buy
|
Safety / PPE
|
|||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| ME_MEKAKA_PUNE | Worker Category 1 | hrs | ||||||||||
| KAME-ME-KARI-KARI_KAKARITO | BE electrical insulation asbestos paper, thickness KA.PU-KA.SA mm | t | ||||||||||
| KAME-ME-KARI-KAVO_MEKAPUKA | PMB brand paronite sheet (PON-A, PON-B), thickness from KA.PU to 5 mm | kg | ||||||||||
| KAME-TO-KAME-KANE_KAKATOPU | Copper-graphite lubricant | kg | ||||||||||
| KAME-TO-KAME-KANE_KAKASAME | Grease, solid, fat-based, type Z | kg | ||||||||||
| KAME-TO-KAME-KALI_KAKAKADX | Rectified technical ethyl alcohol, grade I | kg | ||||||||||
| KAME-TO-KARI-KAVO_KAKAKAME | Technical gaseous oxygen | m3 | ||||||||||
| KAME-TO-KARI-KADX_KAKARIRI | Propane-butane technical mixture | kg | ||||||||||
| KAME-LI-KARI-KALI_KAKAMEME | Pressboard, grade A | kg | ||||||||||
| KAME-LI-KATO-KAPU_KAKAKAME | Electricity | kWh | ||||||||||
| KAME-LI-KALI-KADX_KAKAPURI | Impregnated hemp gland packings, grade LP | kg | ||||||||||
| KAME-LI-KALI-RIDX_KAMEKAME | Linen thread | kg | ||||||||||
| KAME-LI-MEME-KALI_KARIRILI | Welding electrodes for welding low-alloy and carbon steels UONI 13/45, E42A, diameter 4-5 mm | kg | ||||||||||
| KAME-LI-MESA-KANE_KAMEMEME | Construction nails | t | ||||||||||
| KAME-LI-MEDX-KAPU_KAKATOME | Rubber gaskets (pressed technical plate) | kg | ||||||||||
| KAME-LI-MEDX-MELI_KAKATOSA | Round rubber cord, diameter from NE.KA to VO.KA mm | kg | ||||||||||
| KAME-LI-RIKA-KASA_KAKAMEME | Raw half-linen canvas, density 315 g/m2, width 920 mm | m2 | ||||||||||
| KAME-LI-RIKA-KAVO_KAKARIME | Fireproof impregnated canvas | m2 | ||||||||||
| KAVO-TO-KAME-KARI_KAKARIVO | I-beams with parallel flanges, steel grades St3sp, St3ps, No. 20B-60B | t | ||||||||||
| KAVO-TO-KALI-KAME_KAKANEKA | Hot-rolled steel strip, steel grades St3sp, St3ps, dimensions 100x10 mm | t | ||||||||||
| KAVO-TO-KAVO-KARI_KAKAKAPU | Hot-rolled steel angle bar, steel grades St3sp, St3ps, shelf width 180-200 mm, shelf thickness 11-30 mm | t | ||||||||||
| KAVO-PU-KATO-KARI_KAKAKARI | Hot-rolled smooth reinforcing steel, class A-I, diameter 6-22 mm | t | ||||||||||
| MEME-ME-KATO-KAME_KAKANENE | Edged timber of coniferous species (spruce, pine), natural moisture content, length RI-NE.SA m, width 100 mm and above, thickness 100 mm and above, grade II | m3 | ||||||||||
| MEME-ME-KATO-KASA_KAKANESA | Unedged coniferous boards, natural moisture content, length RI-NE.SA m, width 100-250, thickness 30-50 mm, grade III | m3 | ||||||||||
| MERI-RI-KATO-MERI_KAKARIME | Copper foil M1 | kg | ||||||||||
| MEPU-ME-KAPU-KARI_KAKAKAME | Adhesive, brand 88-NP | kg | ||||||||||
| MEPU-PU-KARI-KAPU_KAMEPURI | MA-0115 oil paint, mummy, iron minium | kg | ||||||||||
| MEPU-PU-KARI-KAPU_KAMENERI | Oil paint MA-011-0, MA-011-1, MA-011-1N, MA-011-2, MA-011-2N | t | ||||||||||
| MEPU-SA-KASA-KAME_KAKAMERI | Combined drying oil for diluting thick oil paints and for exterior work on wooden surfaces | t | ||||||||||
| DXME-KASA-KAPU_KAMEME | Electric bridge cranes, lifting capacity 80 t | Machine hours | ||||||||||
| PU_MEKAKA_KASAKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-KASA-KAPU_KAMEME | Electricity: consumption PURI.DX kW·h/machine-hour | Machine hours | ||||||||||
| DXME-KASA-KANE_KAKALI | Crawler cranes, lifting capacity 25 t | Machine hours | ||||||||||
| PU_MEKAKA_KANEKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-KANE-KAVO_KAKASA | Electric hoists, load capacity 5 t | Machine hours | ||||||||||
| DXME-KANE-KAVO_KAKASA | Electricity: consumption KA.PURI kW·h/machine-hour | Machine hours | ||||||||||
| DXME-MEPU-KARI_KAKAPU | Flatbed trucks, load capacity up to 15 t | Machine hours | ||||||||||
| PU_MEKAKA_KASAKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-MELI-KAPU_KAPURI | Gas welding and cutting equipment | Machine hours | ||||||||||
| DXME-MELI-KAPU_RITOTO | Welding machines for manual arc welding, welding current up to 350 A | Machine hours | ||||||||||
| DXME-MELI-KAPU_RITOTO | Electricity: consumption TO.LI kWh/machine-hour | Machine hours | ||||||||||
| DXME-MEVO-KAME_KAKALI | Mobile screw compressors with internal combustion engines, pressure up to KA.LI MPa (7 atm), capacity up to SA.PU m3/min | Machine hours | ||||||||||
| PU_MEKAKA_KAPUKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-MEDX-KARI_KAKATO | Gear oil pumps, capacity TO.NE m3/h | Machine hours | ||||||||||
| DXME-MEDX-KARI_KAKATO | Electricity: consumption KA.LITO kWh/machine-hour | Machine hours | ||||||||||
| DXME-RIME-MEKA_KAKAPU | Hammers for use with mobile compressor units | Machine hours | ||||||||||
| DXME-RIME-MENE_KAMERI | Hydraulic presses with electric drive | Machine hours | ||||||||||
| DXME-RIME-MENE_KAMERI | Electricity: consumption KA.RISA kW·h/machine-hour | Machine hours | ||||||||||
| DXME-RIME-RIRI_PUTOLI | Mobile oil purification units (centrifuges) | Machine hours | ||||||||||
| DXME-RIME-RIRI_PUTOLI | Electricity: consumption MEME.RIRI kW·h/machine-hour | Machine hours | ||||||||||
| DXME-RIME-RIRI_PUNEME | Filter presses | Machine hours | ||||||||||
| DXME-RIME-RIRI_PUNEME | Electricity: consumption ME.TORI kW·h/machine-hour | Machine hours | ||||||||||
|
CO₂ (kg) — Zusammenfassung
|
||||||||||||
|
CO₂ (kg) wird analysiert...
|
||||||||||||
|
Reg. Price — Zusammenfassung
|
||||||||||||
|
Reg. Price wird analysiert...
|
||||||||||||
|
Alternative — Zusammenfassung
|
||||||||||||
|
Alternative wird analysiert...
|
||||||||||||
|
Optimization — Zusammenfassung
|
||||||||||||
|
Optimization wird analysiert...
|
||||||||||||
|
Where to Buy — Zusammenfassung
|
||||||||||||
|
Where to Buy wird analysiert...
|
||||||||||||
|
Safety / PPE — Zusammenfassung
|
||||||||||||
|
Safety / PPE wird analysiert...
|
||||||||||||
approx.
| kWh | ||||||
|---|---|---|---|---|---|---|
|
KI
|
- | |||||