AI
Workers
Use this position in your own project
The price above is a reference benchmark. OpenConstructionERP lets you reuse this position in a full project estimate — with your regional prices, quantities and margins.
KI
Work Steps
Generating image...
15-30 seconds
Error
:
|
CO₂ (kg)
|
|
Alternative
|
Optimization
|
Where to Buy
|
Safety / PPE
|
|||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| ME_MEKAKA_PUTO | Worker Category 1 | hrs | ||||||||||
| KAVO-RI-KARI-MENE_KAMEMEKA | Brass-plated steel cable (rope) in PVC sheathing, diameter 5 mm | kg | ||||||||||
| RIKA-ME-KARI-MEPU_KAKAKARI | Earring Sr-PU.SA 075 | pcs | ||||||||||
| RIKA-ME-KARI-MESA_KAKAMEME | Aluminum and steel-aluminum wire connector (SOAS) 062-3 | pcs | ||||||||||
| RIKA-ME-KARI-MESA_KAKAMERI | Aluminum wire connector (SOA) 062-2 | pcs | ||||||||||
| RIKA-ME-KARI-RIME_KAKAMERI | KS-156 anchoring unit | pcs | ||||||||||
| RIKA-RI-KARI-KAME_KAKAKARI | Polyethylene insulating bushing | pcs | ||||||||||
| RISA-RI-KAME-KAPU_KAKAKAME | KS-068 fork clamp inserts | 100 pcs | ||||||||||
| RISA-RI-KAME-KAPU_KAKAKATO | KS-067-1 saddle inserts | 100 pcs | ||||||||||
| RISA-RI-KAME-KANE_KAKAKATO | End collet clamp KS-086 | pcs | ||||||||||
| RISA-RI-KAME-KANE_KAKAMEPU | Power clamp for aluminum wires KS-064 | pcs | ||||||||||
| RISA-RI-KAME-MEME_KAKAKAME | KS-007 fork clamp for piston | pcs | ||||||||||
| RISA-RI-KAME-MENE_KAKAKALI | Single saddle for earring KS-008 | pcs | ||||||||||
| RISA-RI-KAME-MELI_KAKAKAME | KS-013 double-pronged eye bolt | pcs | ||||||||||
| RISA-RI-KAME-RIKA_KAKAMELI | KS-1180 articulated piston-eye rod, painted, length 1600 mm | pcs | ||||||||||
| RISA-RI-KAME-RIKA_KAKAMEVO | KS-1180 articulated piston-eye rod, galvanized, length 1600 mm | pcs | ||||||||||
| RISA-RI-KAME-RIME_KAKAPURI | KS-078 locks | 100 pcs | ||||||||||
| RISA-RI-KARI-KAVO_KAKAKAPU | Galvanized steel bracket mounting assembly | pcs | ||||||||||
| DXME-KADX-KAME_KAMEME | Railcars for operation on a contact network with an insulated mounting platform and a crane unit equipped with removable cradles | Machine hours | ||||||||||
| PU_MEKAKA_KANESA | Personnel: 2 man-hours/machine-hour | Machine hours | ||||||||||
|
CO₂ (kg) — Zusammenfassung
|
||||||||||||
|
CO₂ (kg) wird analysiert...
|
||||||||||||
|
Reg. Price — Zusammenfassung
|
||||||||||||
|
Reg. Price wird analysiert...
|
||||||||||||
|
Alternative — Zusammenfassung
|
||||||||||||
|
Alternative wird analysiert...
|
||||||||||||
|
Optimization — Zusammenfassung
|
||||||||||||
|
Optimization wird analysiert...
|
||||||||||||
|
Where to Buy — Zusammenfassung
|
||||||||||||
|
Where to Buy wird analysiert...
|
||||||||||||
|
Safety / PPE — Zusammenfassung
|
||||||||||||
|
Safety / PPE wird analysiert...
|
||||||||||||
approx.
| kWh | ||||||
|---|---|---|---|---|---|---|
|
KI
|
- | |||||