AI
Workers
Use this position in your own project
The price above is a reference benchmark. OpenConstructionERP lets you reuse this position in a full project estimate — with your regional prices, quantities and margins.
KI
Work Steps
Generating image...
15-30 seconds
Error
:
|
CO₂ (kg)
|
|
Alternative
|
Optimization
|
Where to Buy
|
Safety / PPE
|
|||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| ME_MEKAKA_PUDX | Worker Category 1 | hrs | ||||||||||
| KAME-PU-KARI-KARI_KAKAKATO | Straight flat cutter for cutting soil, reinforced with a G24a-02 product of the VK8V brand, length 95 mm, height 26 mm, thickness 13 mm | pcs | ||||||||||
| KAME-PU-KATO-KAPU_KAKAKAME | Twisted rhombic drill steel | kg | ||||||||||
| KAME-LI-KADX-KAME_KAKAMERI | Waterproof safety ammonite in T19 cartridges, diameter 36-37 mm | t | ||||||||||
| KAME-LI-KADX-KARI_KAKATOME | ED-KZ waterproof short-delay electric detonators | 1000 pcs | ||||||||||
| RIME-RI-KATO-KADX_KAKAKAPU | PRN wire, cross-section RI.SA mm2 | 1000 m | ||||||||||
| DXME-KAME-KATO_KAKARI | Scraper complexes, bucket capacity up to KA.SA m3 | Machine hours | ||||||||||
| DXME-KAME-KATO_KAKARI | Electricity: consumption MEPU.DXNE kWh/machine-hour | Machine hours | ||||||||||
| DXME-KATO-MEDX_MEKARI | Electric rock drills | Machine hours | ||||||||||
| DXME-KATO-MEDX_MEKARI | Electricity: consumption KA.PUNE kW·h/machine-hour | Machine hours | ||||||||||
| DXME-KANE-KATO_KASAPU | Mine maneuvering winches for pulling mine cars to the first break | Machine hours | ||||||||||
| DXME-KANE-KATO_KASAPU | Electricity: consumption KA.TODX kW·h/machine-hour | Machine hours | ||||||||||
| DXME-KADX-KARI_KAKAVO | Non-tipping mine cars, capacity RI.SA m3 | Machine hours | ||||||||||
| DXME-RIME-MEKA_KAKAME | Pneumatic jackhammers for use with stationary compressor stations | Machine hours | ||||||||||
|
CO₂ (kg) — Zusammenfassung
|
||||||||||||
|
CO₂ (kg) wird analysiert...
|
||||||||||||
|
Reg. Price — Zusammenfassung
|
||||||||||||
|
Reg. Price wird analysiert...
|
||||||||||||
|
Alternative — Zusammenfassung
|
||||||||||||
|
Alternative wird analysiert...
|
||||||||||||
|
Optimization — Zusammenfassung
|
||||||||||||
|
Optimization wird analysiert...
|
||||||||||||
|
Where to Buy — Zusammenfassung
|
||||||||||||
|
Where to Buy wird analysiert...
|
||||||||||||
|
Safety / PPE — Zusammenfassung
|
||||||||||||
|
Safety / PPE wird analysiert...
|
||||||||||||
approx.
| kWh | ||||||
|---|---|---|---|---|---|---|
|
KI
|
- | |||||