AI
Workers
Use this position in your own project
The price above is a reference benchmark. OpenConstructionERP lets you reuse this position in a full project estimate — with your regional prices, quantities and margins.
KI
Work Steps
Generating image...
15-30 seconds
Error
:
|
CO₂ (kg)
|
|
Alternative
|
Optimization
|
Where to Buy
|
Safety / PPE
|
|||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| ME_MEKAKA_PUSA | Worker Category 1 | hrs | ||||||||||
| KAME-LI-KANE-KASA_KAKAPURI | PVC insulating tape for electrical installation and repair work, black, width 19 mm, thickness KA.MEVO mm | m | ||||||||||
| KAME-LI-MEME-KANE_KAKARIVO | FKDT flux | kg | ||||||||||
| KAME-LI-MEDX-KAPU_KAKAKARI | Rolled vulcanized rubber plates | kg | ||||||||||
| KAME-LI-RIKA-KAPU_KAKAKAPU | Cotton sewing thread, diameter ME.LI mm | kg | ||||||||||
| MEKA-RI-KARI-KAVO_KAKAKAME | Round soft electrical copper wire, diameter ME.KA-TO.KA mm and above | t | ||||||||||
| MEKA-TO-KARI-KATO_KAKAMETO | Tin-lead solder without antimony, grade POS61 | kg | ||||||||||
| MEKA-TO-KARI-KATO_KAKARIVO | Low antimony tin-lead solders, POSSu NEME-KA.SA grade | kg | ||||||||||
| MEPU-PU-KARI-KADX_KAPUKARI | Marking paint for electrical products | kg | ||||||||||
| MEPU-PU-KATO-MEME_KAKAKASA | NC-62 varnish | t | ||||||||||
| RIKA-RI-MEKA-KATO_KAKAKANE | Insulated ring terminals | 100 pcs | ||||||||||
| RIPU-TO-KAME-KAME_KAKAKASA | Polyvinyl chloride electrical conduit, wall thickness KA.NE mm | kg | ||||||||||
| RISA-RI-KAME-KAME_KAKAMEPU | Plastic cable marking tags U136 | 100 pcs | ||||||||||
|
CO₂ (kg) — Zusammenfassung
|
||||||||||||
|
CO₂ (kg) wird analysiert...
|
||||||||||||
|
Reg. Price — Zusammenfassung
|
||||||||||||
|
Reg. Price wird analysiert...
|
||||||||||||
|
Alternative — Zusammenfassung
|
||||||||||||
|
Alternative wird analysiert...
|
||||||||||||
|
Optimization — Zusammenfassung
|
||||||||||||
|
Optimization wird analysiert...
|
||||||||||||
|
Where to Buy — Zusammenfassung
|
||||||||||||
|
Where to Buy wird analysiert...
|
||||||||||||
|
Safety / PPE — Zusammenfassung
|
||||||||||||
|
Safety / PPE wird analysiert...
|
||||||||||||
approx.
| kWh | ||||||
|---|---|---|---|---|---|---|
|
KI
|
- | |||||