AI
Workers
Use this position in your own project
The price above is a reference benchmark. OpenConstructionERP lets you reuse this position in a full project estimate — with your regional prices, quantities and margins.
KI
Work Steps
Generating image...
15-30 seconds
Error
:
|
CO₂ (kg)
|
|
Alternative
|
Optimization
|
Where to Buy
|
Safety / PPE
|
|||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| ME_MEKAKA_PUSA | Worker Category 1 | hrs | ||||||||||
| KAME-TO-KAME-KANE_KAKATOTO | General-purpose graphite grease | kg | ||||||||||
| KAME-TO-KAME-KALI_KAKAKAME | Synthetic butyl alcohol | t | ||||||||||
| KAME-TO-KARI-KAVO_KAKAKAME | Technical gaseous oxygen | m3 | ||||||||||
| KAME-TO-KARI-KADX_KAKARIRI | Propane-butane technical mixture | kg | ||||||||||
| KAME-TO-KASA-TOVO_KARISAME | Molybdenum disulfide | kg | ||||||||||
| KAME-LI-KATO-KAPU_KAKAKAME | Electricity | kWh | ||||||||||
| KAME-LI-MEME-KALI_KARIRILI | Welding electrodes for welding low-alloy and carbon steels UONI 13/45, E42A, diameter 4-5 mm | kg | ||||||||||
| KAME-LI-RIKA-KAVO_KAMERIRI | Cotton wipes, dimensions 400x400 mm, surface density from 105 to 130 g/m2 | m2 | ||||||||||
| MEPU-RI-KANE-KATO_KASARIRI | Organosilicon liquid PFMS-4 | kg | ||||||||||
| RISA-ME-KAME-KAPU_KAKAMERI | Coniferous wood sleepers, untreated, for narrow-gauge railways, type II, length 1200 mm | pcs | ||||||||||
| DXME-KASA-KARI_KAKANE | Gantry cranes, lifting capacity 50 t | Machine hours | ||||||||||
| PU_MEKAKA_KASASA | Personnel: 2 man-hours/machine-hour | Machine hours | ||||||||||
| DXME-KASA-KARI_KAKANE | Electricity: consumption SAME.MESA kWh/machine-hour | Machine hours | ||||||||||
| DXME-KASA-KAPU_KAKAME | Circular action cranes, load capacity 320-160 t, span 43 m | Machine hours | ||||||||||
| PU_MEKAKA_KANEKA | Personnel: 4 man-hours/machine-hours | Machine hours | ||||||||||
| DXME-KASA-KAPU_KAKAME | Electricity: consumption 66 kWh/machine-hour | Machine hours | ||||||||||
| DXME-KADX-KATO_KATOSA | Wide gauge platforms, load capacity 73 t | Machine hours | ||||||||||
| DXME-KADX-KASA_KARIRI | Broad gauge shunting locomotives, power 550 kW (750 hp) | Machine hours | ||||||||||
| PU_MEKAKA_KASAKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-MELI-KAPU_RITOTO | Welding machines for manual arc welding, welding current up to 350 A | Machine hours | ||||||||||
| DXME-MELI-KAPU_RITOTO | Electricity: consumption TO.LI kWh/machine-hour | Machine hours | ||||||||||
|
CO₂ (kg) — Zusammenfassung
|
||||||||||||
|
CO₂ (kg) wird analysiert...
|
||||||||||||
|
Reg. Price — Zusammenfassung
|
||||||||||||
|
Reg. Price wird analysiert...
|
||||||||||||
|
Alternative — Zusammenfassung
|
||||||||||||
|
Alternative wird analysiert...
|
||||||||||||
|
Optimization — Zusammenfassung
|
||||||||||||
|
Optimization wird analysiert...
|
||||||||||||
|
Where to Buy — Zusammenfassung
|
||||||||||||
|
Where to Buy wird analysiert...
|
||||||||||||
|
Safety / PPE — Zusammenfassung
|
||||||||||||
|
Safety / PPE wird analysiert...
|
||||||||||||
approx.
| kWh | ||||||
|---|---|---|---|---|---|---|
|
KI
|
- | |||||