AI
Workers
Use this position in your own project
The price above is a reference benchmark. OpenConstructionERP lets you reuse this position in a full project estimate — with your regional prices, quantities and margins.
KI
Work Steps
Generating image...
15-30 seconds
Error
:
|
CO₂ (kg)
|
|
Alternative
|
Optimization
|
Where to Buy
|
Safety / PPE
|
|||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| ME_MEKAKA_PUSA | Worker Category 1 | hrs | ||||||||||
| KAME-TO-KARI-KAVO_KAKAKAME | Technical gaseous oxygen | m3 | ||||||||||
| KAME-TO-KARI-KADX_KAKARIRI | Propane-butane technical mixture | kg | ||||||||||
| KAME-LI-KATO-KAPU_KAKAKAME | Electricity | kWh | ||||||||||
| KAVO-TO-KAME-KARI_KAKARIPU | I-beams with parallel flanges, steel grades St3sp, St3ps, No. 10B-18B | t | ||||||||||
| KAVO-TO-KAPU-KARI_KAKADXSA | Hot-rolled round steel bars, steel grades St3sp, St3ps, diameter 14-50 mm | t | ||||||||||
| KAVO-TO-KASA-KARI_KAKARIME | Hot-rolled sheet metal, steel grades St3sp, St3ps, width 1200-3000 mm, thickness 1-8 mm | t | ||||||||||
| KAVO-TO-KASA-KARI_KAMEKARI | Hot-rolled sheet metal, steel grades St3sp, St3ps, width 1200-3000 mm, thickness 14-24 mm | t | ||||||||||
| KAVO-TO-KAVO-KARI_KAKAPUSA | Hot-rolled steel angle bar with equal flanges, steel grades St3sp, St3ps, flange width 63-100 mm, flange thickness 4-16 mm | t | ||||||||||
| KAVO-TO-KAVO-KARI_KAKASAVO | Hot-rolled steel angle bar, steel grades St3sp, St3ps, shelf width 35-56 mm, shelf thickness 3-5 mm | t | ||||||||||
| KAVO-TO-MEME-KAME_MEMEKARI | Hot-rolled steel channels, steel grades St3ps, St3sp, No. 12U-24U, No. 12P-24P | t | ||||||||||
| DXME-KASA-KARI_KAKANE | Gantry cranes, lifting capacity 50 t | Machine hours | ||||||||||
| PU_MEKAKA_KASASA | Personnel: 2 man-hours/machine-hour | Machine hours | ||||||||||
| DXME-KASA-KARI_KAKANE | Electricity: consumption SAME.MESA kWh/machine-hour | Machine hours | ||||||||||
| DXME-KASA-KAPU_KAMEKA | Electric bridge cranes, load capacity 50 t | Machine hours | ||||||||||
| PU_MEKAKA_KASAKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-KASA-KAPU_KAMEKA | Electricity: consumption PUNE.LI kW·h/machine-hour | Machine hours | ||||||||||
| DXME-KASA-MERI_KAKAME | Rail-mounted jib cranes, lifting capacity 50-100 t | Machine hours | ||||||||||
| PU_MEKAKA_MEKAKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-KASA-MERI_KAKAME | Electricity: consumption 69 kW·h/machine-hour | Machine hours | ||||||||||
| DXME-KANE-KAME_KAKATO | Hydraulic jacks, lifting capacity 63-100 t | Machine hours | ||||||||||
| DXME-MEPU-KARI_KAKARI | Trucks, load capacity up to 8 tons | Machine hours | ||||||||||
| PU_MEKAKA_KAPUKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
|
CO₂ (kg) — Zusammenfassung
|
||||||||||||
|
CO₂ (kg) wird analysiert...
|
||||||||||||
|
Reg. Price — Zusammenfassung
|
||||||||||||
|
Reg. Price wird analysiert...
|
||||||||||||
|
Alternative — Zusammenfassung
|
||||||||||||
|
Alternative wird analysiert...
|
||||||||||||
|
Optimization — Zusammenfassung
|
||||||||||||
|
Optimization wird analysiert...
|
||||||||||||
|
Where to Buy — Zusammenfassung
|
||||||||||||
|
Where to Buy wird analysiert...
|
||||||||||||
|
Safety / PPE — Zusammenfassung
|
||||||||||||
|
Safety / PPE wird analysiert...
|
||||||||||||
approx.
| kWh | ||||||
|---|---|---|---|---|---|---|
|
KI
|
- | |||||