AI
Workers
Use this position in your own project
The price above is a reference benchmark. OpenConstructionERP lets you reuse this position in a full project estimate — with your regional prices, quantities and margins.
KI
Work Steps
Generating image...
15-30 seconds
Error
:
|
CO₂ (kg)
|
|
Alternative
|
Optimization
|
Where to Buy
|
Safety / PPE
|
|||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| KASA-ME-KAPU-RILI | Precast reinforced concrete panels | m3 | ||||||||||
| ME_MEKAKA_TOVO | Worker Category 1 | hrs | ||||||||||
| KAME-TO-KARI-KATO_KAKAKAME | Acetylene gas, technical grade | m3 | ||||||||||
| KAME-TO-KARI-KAVO_KAKAKAME | Technical gaseous oxygen | m3 | ||||||||||
| KAME-LI-MEME-KALI_KARIRILI | Welding electrodes for welding low-alloy and carbon steels UONI 13/45, E42A, diameter 4-5 mm | kg | ||||||||||
| KARI-TO-KAME-KARI_MEMEKAPU | Natural sand for construction works, class I, medium | m3 | ||||||||||
| KAPU-TO-KAME-KADX_KAKAMENE | Ready-mixed masonry mortar, cement, M200 | m3 | ||||||||||
| KAVO-TO-KASA-KARI_KAKAKAME | Hot-rolled sheet metal, steel grades St3sp, St3ps, width 1200-3000 mm, thickness 9-12 mm | t | ||||||||||
| DXME-KASA-KANE_KAKAVO | Crawler cranes with a lifting capacity of 40 tons | Machine hours | ||||||||||
| PU_MEKAKA_KALIKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-KANE-KASA_KAMEME | Universal front-end pneumatic wheeled single-bucket loaders, nominal capacity of main bucket RI.NE m3, load capacity 5 t | Machine hours | ||||||||||
| PU_MEKAKA_KASAKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-MEPU-KARI_KAKAME | Flatbed trucks, load capacity up to 5 tons | Machine hours | ||||||||||
| PU_MEKAKA_KAPUKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-MEPU-KAPU_KAKAME | Tractor units, load on the fifth wheel coupling up to 12 t | Machine hours | ||||||||||
| PU_MEKAKA_KASAKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-MEPU-KASA_KAMERI | General purpose semi-trailers, load capacity up to 15 t | Machine hours | ||||||||||
| DXME-MELI-KAPU_KATOPU | Welding units with internal combustion engines for manual arc welding, welding current up to 400 A, number of stations 1 | Machine hours | ||||||||||
| DXME-MELI-KAPU_KAPURI | Gas welding and cutting equipment | Machine hours | ||||||||||
| DXME-MEDX-KANE_KAMEME | Mud pumps, capacity RITO.PU-NESA.TO m3/h, discharge pressure MESA.LI-SA.VOVO MPa (160-60 kgf/cm2) | Machine hours | ||||||||||
| DXME-MEDX-KANE_KAMEME | Electricity: consumption MEVO.MESA kWh/machine-hour | Machine hours | ||||||||||
|
CO₂ (kg) — Zusammenfassung
|
||||||||||||
|
CO₂ (kg) wird analysiert...
|
||||||||||||
|
Reg. Price — Zusammenfassung
|
||||||||||||
|
Reg. Price wird analysiert...
|
||||||||||||
|
Alternative — Zusammenfassung
|
||||||||||||
|
Alternative wird analysiert...
|
||||||||||||
|
Optimization — Zusammenfassung
|
||||||||||||
|
Optimization wird analysiert...
|
||||||||||||
|
Where to Buy — Zusammenfassung
|
||||||||||||
|
Where to Buy wird analysiert...
|
||||||||||||
|
Safety / PPE — Zusammenfassung
|
||||||||||||
|
Safety / PPE wird analysiert...
|
||||||||||||
approx.
| kWh | ||||||
|---|---|---|---|---|---|---|
|
KI
|
- | |||||