AI
Workers
Use this position in your own project
The price above is a reference benchmark. OpenConstructionERP lets you reuse this position in a full project estimate — with your regional prices, quantities and margins.
KI
Work Steps
Generating image...
15-30 seconds
Error
:
|
CO₂ (kg)
|
|
Alternative
|
Optimization
|
Where to Buy
|
Safety / PPE
|
|||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| KARI-RI-KASA-KAPU | Crushed rock from dense rock formations | m3 | ||||||||||
| KARI-TO-KAME-KARI | Sand for construction work | m3 | ||||||||||
| KAPU-RI-KAME-KARI | Asphalt concrete mixes | t | ||||||||||
| KASA-ME-KAME-KADX | Support ring segments | m3 | ||||||||||
| KAVO-ME-KARI-KANE | Floating cast iron hatch | pcs | ||||||||||
| RI_MEKAKA_KARI | 2nd grade worker | hrs | ||||||||||
| RI_MEKAKA_KATO | Grade 3 worker | hrs | ||||||||||
| RI_MEKAKA_KAPU | Grade 4 worker | hrs | ||||||||||
| RI_MEKAKA_KAME | Grade 1 worker | hrs | ||||||||||
| RI_MEKAKA_KASA | Grade 5 worker | hrs | ||||||||||
| KAME-RI-KAME-KAME_KAKAKAME | Bitumen oil road MG 40/70, MG 70/130, MG 130/200, SG 40/70, SG 70/130, SG 130/200 | t | ||||||||||
| KAME-LI-KATO-KAME_KAKAKAME | Water | m3 | ||||||||||
| KAME-LI-KATO-KAPU_KAKAKAME | Electricity | kWh | ||||||||||
| KATO-RI-KAME-KAME_KAKAKATO | Portland cement without additives for general construction CEM 0 42.5N | t | ||||||||||
| KAPU-TO-KARI-METO_KATONENE | Dry cement masonry mixes, class B15 (M200) | t | ||||||||||
| DXME-KASA-METO_KARIME | Flatbed trucks, load capacity up to ME.SA t, with crane-manipulator, load capacity 1 t | Machine hours | ||||||||||
| PU_MEKAKA_KAPUKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-KAVO-KATO_KAMENE | Self-propelled smooth vibratory rollers, weight 8 t | Machine hours | ||||||||||
| PU_MEKAKA_KASAKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-KAVO-KANE_KAKARI | Joint cutters, maximum cutting depth 150 mm, power 4 kW (6 hp) | Machine hours | ||||||||||
| DXME-MEVO-KAME_KAKALI | Mobile screw compressors with internal combustion engines, pressure up to KA.LI MPa (7 atm), capacity up to SA.PU m3/min | Machine hours | ||||||||||
| PU_MEKAKA_KAPUKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-RIME-MEKA_KAKARI | Pneumatic jackhammers powered by mobile compressors | Machine hours | ||||||||||
| DXDXDX_DXDXKAKA | Construction waste | t | ||||||||||
|
CO₂ (kg) — Zusammenfassung
|
||||||||||||
|
CO₂ (kg) wird analysiert...
|
||||||||||||
|
Reg. Price — Zusammenfassung
|
||||||||||||
|
Reg. Price wird analysiert...
|
||||||||||||
|
Alternative — Zusammenfassung
|
||||||||||||
|
Alternative wird analysiert...
|
||||||||||||
|
Optimization — Zusammenfassung
|
||||||||||||
|
Optimization wird analysiert...
|
||||||||||||
|
Where to Buy — Zusammenfassung
|
||||||||||||
|
Where to Buy wird analysiert...
|
||||||||||||
|
Safety / PPE — Zusammenfassung
|
||||||||||||
|
Safety / PPE wird analysiert...
|
||||||||||||
approx.
| kWh | ||||||
|---|---|---|---|---|---|---|
|
KI
|
- | |||||