AI
Workers
Use this position in your own project
The price above is a reference benchmark. OpenConstructionERP lets you reuse this position in a full project estimate — with your regional prices, quantities and margins.
KI
Work Steps
Generating image...
15-30 seconds
Error
:
|
CO₂ (kg)
|
|
Alternative
|
Optimization
|
Where to Buy
|
Safety / PPE
|
|||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| ME_MEKAKA_TODX | Worker Category 1 | hrs | ||||||||||
| RIKA-RI-KARI-KAME_KAKAMEDX | Insulating bushings, dimensions 65x50x18 mm | 1000 pcs | ||||||||||
| RISA-ME-KATO-KAME_KAKAMEME | PK terminals | t | ||||||||||
| RISA-ME-KATO-KAPU_KAKAMETO | Steel washers, type TsP-138, dimensions 65x40 mm | 1000 pcs | ||||||||||
| RISA-ME-KATO-KANE_KAKAMEME | Double-coil spring washers, hole diameter M22 | t | ||||||||||
| RISA-ME-KATO-KANE_KAKAPURI | Steel disc washers, outer diameter 28 mm, inner diameter MEKA.RI mm, thickness ME.SA mm | t | ||||||||||
| RISA-ME-KAPU-KAME_KAKAKAME | Anchor bolts for railway track fastenings, diameter M22, length 175 mm, with nut diameter M22 | t | ||||||||||
| RISA-ME-KAPU-KARI_KAKAKAME | Terminal bolts for railway track fastenings, diameter M22, length 75 mm, with nut diameter M22 | t | ||||||||||
| RISA-ME-KAPU-KAPU_KAKAKATO | Track bolts for fastening rails, diameter M27, length 160 mm, 180 mm, with nut diameter M27 | t | ||||||||||
| RISA-ME-KASA-KAME_KAKAKAME | Double-headed rail plate, type 1P65 | pcs | ||||||||||
| RISA-ME-KASA-KARI_KAKAKANE | Separate fastening pads for railway tracks for reinforced concrete sleepers, type KB-65 | t | ||||||||||
| RISA-ME-KANE-MEVO_KAKAMEPU | Rubber pads for reinforced concrete rail base, type CP-143 | 1000 pcs | ||||||||||
| RISA-ME-KANE-MEDX_KAKASAME | Rubber rail base pad for underlayment, type TsP-328 | pcs | ||||||||||
| DXME-KADX-KATO_KATOSA | Wide gauge platforms, load capacity 73 t | Machine hours | ||||||||||
| DXME-KADX-KAPU_KAKARI | Wide-gauge freight crane draisines, crane capacity TO.SA t | Machine hours | ||||||||||
| PU_MEKAKA_KANEKA | Personnel: 2 man-hours/machine-hour | Machine hours | ||||||||||
| DXME-KADX-MERI_KARIME | Track jacks | Machine hours | ||||||||||
| DXME-KADX-MERI_KATOME | Universal track wrenches | Machine hours | ||||||||||
| DXME-KADX-MERI_KATOME | Electricity: consumption KA.SA kW·h/machine-hour | Machine hours | ||||||||||
|
CO₂ (kg) — Zusammenfassung
|
||||||||||||
|
CO₂ (kg) wird analysiert...
|
||||||||||||
|
Reg. Price — Zusammenfassung
|
||||||||||||
|
Reg. Price wird analysiert...
|
||||||||||||
|
Alternative — Zusammenfassung
|
||||||||||||
|
Alternative wird analysiert...
|
||||||||||||
|
Optimization — Zusammenfassung
|
||||||||||||
|
Optimization wird analysiert...
|
||||||||||||
|
Where to Buy — Zusammenfassung
|
||||||||||||
|
Where to Buy wird analysiert...
|
||||||||||||
|
Safety / PPE — Zusammenfassung
|
||||||||||||
|
Safety / PPE wird analysiert...
|
||||||||||||
approx.
| kWh | ||||||
|---|---|---|---|---|---|---|
|
KI
|
- | |||||