AI
Workers
Use this position in your own project
The price above is a reference benchmark. OpenConstructionERP lets you reuse this position in a full project estimate — with your regional prices, quantities and margins.
KI
Work Steps
Generating image...
15-30 seconds
Error
:
|
CO₂ (kg)
|
|
Alternative
|
Optimization
|
Where to Buy
|
Safety / PPE
|
|||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| ME_MEKAKA_RIPU | Worker Category 1 | hrs | ||||||||||
| KAME-LI-MESA-KANE_KAKARIME | Galvanized steel roofing nails, diameter 2-3 mm, length 20-40 mm | kg | ||||||||||
| KAME-LI-MESA-KANE_KAMEMEME | Construction nails | t | ||||||||||
| KAVO-ME-KARI-RISA_KAKAVORI | T-shaped steel roofing crutch, dimensions 100x400x4 mm, strip thickness 40 mm | pcs | ||||||||||
| KAVO-TO-KASA-KASA_KAKASATO | Galvanized sheet steel, thickness KA.LI mm | t | ||||||||||
| MEME-ME-KATO-KANE_KAKALIRI | Edged softwood boards, natural moisture content, length RI-NE.SA m, width 100-250 mm, thickness 25 mm, grade IV | m3 | ||||||||||
| MERI-ME-KATO-MEKA_KAKAKALI | Bracket for fastening the eaves apron of the drainage system, painted | pcs | ||||||||||
| MEPU-SA-KAPU-KALI_KAKAMERI | Two-component thiokol mastic for construction purposes, cold curing | kg | ||||||||||
| DXME-KASA-KASA_KAMESA | Mobile cranes, lifting capacity 16 t | Machine hours | ||||||||||
| PU_MEKAKA_KANEKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-KANE-KATO_KANEKA | Electric winches with a pulling force of up to SA.LIDX kN (KA.SADX t) | Machine hours | ||||||||||
| DXME-MEPU-KARI_KAKAME | Flatbed trucks, load capacity up to 5 tons | Machine hours | ||||||||||
| PU_MEKAKA_KAPUKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXDXDX_DXDXKAKA | Construction waste | t | ||||||||||
|
CO₂ (kg) — Zusammenfassung
|
||||||||||||
|
CO₂ (kg) wird analysiert...
|
||||||||||||
|
Reg. Price — Zusammenfassung
|
||||||||||||
|
Reg. Price wird analysiert...
|
||||||||||||
|
Alternative — Zusammenfassung
|
||||||||||||
|
Alternative wird analysiert...
|
||||||||||||
|
Optimization — Zusammenfassung
|
||||||||||||
|
Optimization wird analysiert...
|
||||||||||||
|
Where to Buy — Zusammenfassung
|
||||||||||||
|
Where to Buy wird analysiert...
|
||||||||||||
|
Safety / PPE — Zusammenfassung
|
||||||||||||
|
Safety / PPE wird analysiert...
|
||||||||||||
approx.
| kWh | ||||||
|---|---|---|---|---|---|---|
|
KI
|
- | |||||