| RISA-ME-KASA-KASA | Welded rail tracks for continuous welded track made of R65 rails | m | ||||||||||
| RISA-ME-KASA-KASA | Broad gauge railway rails, type P65 | m | ||||||||||
| ME_MEKAKA_TOME | Worker Category 1 | hrs | ||||||||||
| RISA-ME-KAPU-KAPU_KAKAKATO | Track bolts for fastening rails, diameter M27, length 160 mm, 180 mm, with nut diameter M27 | t | ||||||||||
| RISA-ME-KASA-KAME_KAKAKAME | Double-headed rail plate, type 1P65 | pcs | ||||||||||
| DXME-KANE-KAME_KAKARI | Hydraulic jacks, lifting capacity NE.TO-RISA t | Machine hours | ||||||||||
| DXME-KADX-KATO_KATOME | Motor platforms for track layers | Machine hours | ||||||||||
| PU_MEKAKA_KANEKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-KADX-KATO_KATOSA | Wide gauge platforms, load capacity 73 t | Machine hours | ||||||||||
| DXME-KADX-KATO_KATOLI | Wide gauge platforms with roller conveyor | Machine hours | ||||||||||
| DXME-KADX-KAPU_KAKARI | Wide-gauge freight crane draisines, crane capacity TO.SA t | Machine hours | ||||||||||
| PU_MEKAKA_KANEKA | Personnel: 2 man-hours/machine-hour | Machine hours | ||||||||||
| DXME-KADX-KASA_KARITO | Broad gauge shunting locomotives, power 880 kW (1200 hp) | Machine hours | ||||||||||
| PU_MEKAKA_KASAKA | Personnel: 2 man-hours/machine-hour | Machine hours | ||||||||||
| DXME-KADX-KAVO_KAMEME | Special trains for transporting single-tier rail strings, string length up to 800 m, number of strings up to 12 | Machine hours | ||||||||||
| PU_MEKAKA_KASAKA | Personnel: 2 man-hours/machine-hour | Machine hours | ||||||||||
| DXME-KADX-KADX_KAKATO | Laying cranes for 25 m rail sections on reinforced concrete sleepers | Machine hours | ||||||||||
| PU_MEKAKA_KANEKA | Personnel: 2 man-hours/machine-hour | Machine hours | ||||||||||
| DXME-KADX-MERI_KAKAME | Motorized track wrenches | Machine hours | ||||||||||
| PU_MEKAKA_KANESA | Personnel: 2 man-hours/machine-hour | Machine hours | ||||||||||
| DXME-KADX-MERI_KATOME | Universal track wrenches | Machine hours | ||||||||||
| DXME-KADX-MERI_KATOME | Electricity: consumption KA.SA kW·h/machine-hour | Machine hours | ||||||||||
| DXME-KADX-MERI_MEKAME | Rail cutting machines | Machine hours | ||||||||||
| DXME-KADX-MERI_MEKAME | Electricity: consumption ME.DXME kW·h/machine-hour | Machine hours | ||||||||||
| DXME-KADX-MERI_MEKARI | Rail drilling machines, power ME.MESA kW | Machine hours | ||||||||||
| DXME-KADX-MERI_MEKARI | Electricity: consumption KA.TOVO kW·h/machine-hour | Machine hours | ||||||||||
|
CO₂ (kg) — Zusammenfassung
|
||||||||||||
|
CO₂ (kg) wird analysiert...
|
||||||||||||
|
Reg. Price — Zusammenfassung
|
||||||||||||
|
Reg. Price wird analysiert...
|
||||||||||||
|
Alternative — Zusammenfassung
|
||||||||||||
|
Alternative wird analysiert...
|
||||||||||||
|
Optimization — Zusammenfassung
|
||||||||||||
|
Optimization wird analysiert...
|
||||||||||||
|
Where to Buy — Zusammenfassung
|
||||||||||||
|
Where to Buy wird analysiert...
|
||||||||||||
|
Safety / PPE — Zusammenfassung
|
||||||||||||
|
Safety / PPE wird analysiert...
|
||||||||||||
approx.
| kWh | ||||||
|---|---|---|---|---|---|---|
|
KI
|
- | |||||