AI
Workers
Use this position in your own project
The price above is a reference benchmark. OpenConstructionERP lets you reuse this position in a full project estimate — with your regional prices, quantities and margins.
KI
Work Steps
Generating image...
15-30 seconds
Error
:
|
CO₂ (kg)
|
|
Alternative
|
Optimization
|
Where to Buy
|
Safety / PPE
|
|||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| MEPU-RI-KAPU-KATO | Epoxy resins | kg | ||||||||||
| RIPU-TO-KAPU-MERI | Pipes made of other polymers | m | ||||||||||
| ME_MEKAKA_SANE | Worker Category 1 | hrs | ||||||||||
| KAME-LI-KATO-KAME_KAKAKAME | Water | m3 | ||||||||||
| KAME-LI-KATO-KAPU_KAKAKAME | Electricity | kWh | ||||||||||
| KAME-LI-KANE-MEPU_KAKAPUME | Polyethylene-laminated fabric-based tape with adhesive layer on one side for sealing and insulation, gray, width 48 mm, thickness KA.MEVO mm | 10 m | ||||||||||
| KAME-LI-KALI-MEDX_KAKAMEME | Cleaning agent (solution) | l | ||||||||||
| RITO-ME-KARI-KANE_KAMEKAME | Plastic fastening ties, width 10 mm, length 300 mm | 100 pcs | ||||||||||
| RIPU-ME-KARI-KAME_KAKATOKA | Galvanized metal double-jaw clamp with two quick-release locks and rubber profile for securing pipes, M10 fastening nut, diameter from 198 to 202 mm | pcs | ||||||||||
| DXME-KANE-KARI_KAKAPU | Mobile belt conveyors, length 14 m | Machine hours | ||||||||||
| PU_MEKAKA_KAPUKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-KANE-KARI_KAKAPU | Electricity: consumption ME.VORI kW·h/machine-hour | Machine hours | ||||||||||
| DXME-KANE-KATO_KANEKA | Electric winches with a pulling force of up to SA.LIDX kN (KA.SADX t) | Machine hours | ||||||||||
| DXME-METO-KATO_KADXME | Machines for inserting hoses with a steam generator based on a vehicle, steam capacity 50 kg/h | Machine hours | ||||||||||
| PU_MEKAKA_KAPUKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-MEPU-KARI_KAKAME | Flatbed trucks, load capacity up to 5 tons | Machine hours | ||||||||||
| PU_MEKAKA_KAPUKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-MEVO-KAME_KAMETO | Mobile compressors, pressure 2 MPa (20 atm), capacity 60 m3/min | Machine hours | ||||||||||
| PU_MEKAKA_KANEKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-MEDX-KAVO_KAKALI | Pumps, capacity LI.RI m3/h, head 26 m, power SA.SA kW | Machine hours | ||||||||||
| DXME-MEDX-KAVO_KAKALI | Electricity: consumption ME.VORI kW·h/machine-hour | Machine hours | ||||||||||
|
CO₂ (kg) — Zusammenfassung
|
||||||||||||
|
CO₂ (kg) wird analysiert...
|
||||||||||||
|
Reg. Price — Zusammenfassung
|
||||||||||||
|
Reg. Price wird analysiert...
|
||||||||||||
|
Alternative — Zusammenfassung
|
||||||||||||
|
Alternative wird analysiert...
|
||||||||||||
|
Optimization — Zusammenfassung
|
||||||||||||
|
Optimization wird analysiert...
|
||||||||||||
|
Where to Buy — Zusammenfassung
|
||||||||||||
|
Where to Buy wird analysiert...
|
||||||||||||
|
Safety / PPE — Zusammenfassung
|
||||||||||||
|
Safety / PPE wird analysiert...
|
||||||||||||
approx.
| kWh | ||||||
|---|---|---|---|---|---|---|
|
KI
|
- | |||||