AI
Workers
Use this position in your own project
The price above is a reference benchmark. OpenConstructionERP lets you reuse this position in a full project estimate — with your regional prices, quantities and margins.
KI
Work Steps
Generating image...
15-30 seconds
Error
:
|
CO₂ (kg)
|
|
Alternative
|
Optimization
|
Where to Buy
|
Safety / PPE
|
|||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| RINE-ME-KAME-KARI | Bolt kit for tunnels | set | ||||||||||
| RINE-ME-KAME-KAPU | Tubing plugs | pcs | ||||||||||
| ME_MEKAKA_TODX | Worker Category 1 | hrs | ||||||||||
| KAME-LI-KATO-KAME_KAKAKAME | Water | m3 | ||||||||||
| KAME-LI-MEDX-KADX_KAKARIME | Rubber-fabric pressure hose for water with a pressure of 1 MPa (10 kgf/cm2), inner diameter 16 mm | m | ||||||||||
| KARI-TO-KAME-KARI_MEMEMEVO | Natural sand for construction works, class II, medium | m3 | ||||||||||
| KATO-RI-KARI-KAVO_KAKAKAME | Expanding gypsum-clay cement | t | ||||||||||
| KAPU-TO-KARI-MEPU_MEKAKAKA | Dry waterproofing mixtures based on activated bentonite for creating paste-like anti-filtration curtains and screens, consumption 30-50 kg/m2 | t | ||||||||||
| MEKA-TO-KAME-KANE_KAKAKARI | Round lead wire, diameter 11 mm | kg | ||||||||||
| MEME-RI-METO-KANE_KAKAMERI | Flooring boards, thickness 25 mm | m2 | ||||||||||
| RITO-TO-KANE-KASA_KAKAKATO | Non-galvanized welded steel pipes for water and gas supply with thread, ordinary, nominal diameter 25 mm, wall thickness TO.RI mm | m | ||||||||||
| RINE-ME-KAME-KARI_KAKATOME | Asbestos-bitumen steel waterproofing washers, hole diameter M27 | 1000 pcs | ||||||||||
| DXME-KATO-MEME_KAKARI | Auxiliary transfer trolleys | Machine hours | ||||||||||
| DXME-KATO-MEDX_KADXME | Hand-held pneumatic wrenches for use with stationary compressor stations | Machine hours | ||||||||||
| DXME-KANE-KATO_KATOPU | Auxiliary mine winches with a pulling force of RIPU.SATO kN (RI.SA t) | Machine hours | ||||||||||
| DXME-KANE-KATO_KATOPU | Electricity: consumption ME.KANE kW·h/machine-hour | Machine hours | ||||||||||
| DXME-KALI-KALI_KAPUME | Mortar pumps, capacity 1 m3/h | Machine hours | ||||||||||
| PU_MEKAKA_KATOKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-KALI-KALI_KAPUME | Electricity: consumption KA.PUVO kW·h/machine-hour | Machine hours | ||||||||||
| DXME-KALI-KAVO_KARIME | Stationary mortar mixers for preparing cement-water and other mortars, capacity 350 l | Machine hours | ||||||||||
| DXME-KALI-KAVO_KARIME | Electricity: consumption ME.TORI kW·h/machine-hour | Machine hours | ||||||||||
| DXME-KAVO-KASA_KADXME | Cement spreaders for joint filling | Machine hours | ||||||||||
| DXME-MEVO-KAME_KAKALI | Mobile screw compressors with internal combustion engines, pressure up to KA.LI MPa (7 atm), capacity up to SA.PU m3/min | Machine hours | ||||||||||
| PU_MEKAKA_KAPUKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-RIME-KATO_SAKARI | Sandblasting machines operating from mobile compressor units, volume up to 19 l, air consumption 270-700 l/min | Machine hours | ||||||||||
| DXME-RIME-MEKA_KAKAME | Pneumatic jackhammers for use with stationary compressor stations | Machine hours | ||||||||||
|
CO₂ (kg) — Zusammenfassung
|
||||||||||||
|
CO₂ (kg) wird analysiert...
|
||||||||||||
|
Reg. Price — Zusammenfassung
|
||||||||||||
|
Reg. Price wird analysiert...
|
||||||||||||
|
Alternative — Zusammenfassung
|
||||||||||||
|
Alternative wird analysiert...
|
||||||||||||
|
Optimization — Zusammenfassung
|
||||||||||||
|
Optimization wird analysiert...
|
||||||||||||
|
Where to Buy — Zusammenfassung
|
||||||||||||
|
Where to Buy wird analysiert...
|
||||||||||||
|
Safety / PPE — Zusammenfassung
|
||||||||||||
|
Safety / PPE wird analysiert...
|
||||||||||||
approx.
| kWh | ||||||
|---|---|---|---|---|---|---|
|
KI
|
- | |||||