| RI_MEKAKA_KATO | Grade 3 worker | hrs | ||||||||||
| RI_MEKAKA_KAPU | Grade 4 worker | hrs | ||||||||||
| RI_MEKAKA_KASA | Grade 5 worker | hrs | ||||||||||
| RI_MEKAKA_KANE | Grade 6 worker | hrs | ||||||||||
| RISA-RI-KAME-KANE_KAKASAPU | KS-055-2 (KS-325-1) connecting clamp | pcs | ||||||||||
| RISA-RI-KAME-KANE_MEKAMEVO | Bronze clamp for attaching strings to the supporting cable, dimensions 42x45x23 mm | pcs | ||||||||||
| RISA-RI-KAME-MEME_KAKAKASA | Splices for copper wires KS-063 | 100 pcs | ||||||||||
| RISA-RI-KAME-MEME_KAKAKANE | Polymer clamps | 1000 pcs | ||||||||||
| DXME-KADX-KAME_KAKATO | Railway vehicles for installation work on the contact network, tension during wire rolling up to 35 kN, technological movement speed up to 5 km/h | Machine hours | ||||||||||
| PU_MEKAKA_KASAKA | Personnel: 2 man-hours/machine-hour | Machine hours | ||||||||||
| DXME-KADX-KAME_KAKALI | Railcars for working on contact networks with a crane-manipulator and a wire positioning module, suspension height up to MEKA.SA m | Machine hours | ||||||||||
| PU_MEKAKA_KASASA | Personnel: 2 man-hours/machine-hour | Machine hours | ||||||||||
| DXME-KADX-KAME_KAMEME | Railcars for operation on a contact network with an insulated mounting platform and a crane unit equipped with removable cradles | Machine hours | ||||||||||
| PU_MEKAKA_KANESA | Personnel: 2 man-hours/machine-hour | Machine hours | ||||||||||
|
CO₂ (kg) — Zusammenfassung
|
||||||||||||
|
CO₂ (kg) wird analysiert...
|
||||||||||||
|
Reg. Price — Zusammenfassung
|
||||||||||||
|
Reg. Price wird analysiert...
|
||||||||||||
|
Alternative — Zusammenfassung
|
||||||||||||
|
Alternative wird analysiert...
|
||||||||||||
|
Optimization — Zusammenfassung
|
||||||||||||
|
Optimization wird analysiert...
|
||||||||||||
|
Where to Buy — Zusammenfassung
|
||||||||||||
|
Where to Buy wird analysiert...
|
||||||||||||
|
Safety / PPE — Zusammenfassung
|
||||||||||||
|
Safety / PPE wird analysiert...
|
||||||||||||
approx.
| kWh | ||||||
|---|---|---|---|---|---|---|
|
KI
|
- | |||||