AI
Workers
Use this position in your own project
The price above is a reference benchmark. OpenConstructionERP lets you reuse this position in a full project estimate — with your regional prices, quantities and margins.
KI
Work Steps
Generating image...
15-30 seconds
Error
:
|
CO₂ (kg)
|
|
Alternative
|
Optimization
|
Where to Buy
|
Safety / PPE
|
|||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| ME_MEKAKA_PUPU | Worker Category 1 | hrs | ||||||||||
| KAME-TO-KAME-KAME_KAKAKAME | B-70 aviation gasoline | t | ||||||||||
| KAME-TO-KAME-KANE_KAKAPUDX | Torsio-55 grease | kg | ||||||||||
| KAME-TO-KAME-KALI_KAKAKADX | Rectified technical ethyl alcohol, grade I | kg | ||||||||||
| KAME-TO-KARI-KAVO_KAKAKAME | Technical gaseous oxygen | m3 | ||||||||||
| KAME-TO-KARI-KADX_KAKARIRI | Propane-butane technical mixture | kg | ||||||||||
| KAME-LI-MEME-KALI_KARIRILI | Welding electrodes for welding low-alloy and carbon steels UONI 13/45, E42A, diameter 4-5 mm | kg | ||||||||||
| KAME-LI-MESA-KANE_KAMEMEME | Construction nails | t | ||||||||||
| KAME-LI-MELI-MEME_KAKAKARI | Sanding paper | m2 | ||||||||||
| KAME-LI-MEDX-KALI_KAKAMEKA | Calendered rubber mixture made of SKMS-30ARKM15 rubber, hardness 80-100 Shore A units, thickness ME.SA mm | kg | ||||||||||
| KAVO-TO-KAME-KARI_KAKARIPU | I-beams with parallel flanges, steel grades St3sp, St3ps, No. 10B-18B | t | ||||||||||
| KAVO-TO-KATO-KAPU_KAKAMEPU | Light wire, diameter TO.KA mm | t | ||||||||||
| KAVO-TO-KASA-KARI_KAKARIME | Hot-rolled sheet metal, steel grades St3sp, St3ps, width 1200-3000 mm, thickness 1-8 mm | t | ||||||||||
| KAVO-TO-KALI-KAME_KAKANEKA | Hot-rolled steel strip, steel grades St3sp, St3ps, dimensions 100x10 mm | t | ||||||||||
| KAVO-TO-KAVO-KARI_KAKAKAPU | Hot-rolled steel angle bar, steel grades St3sp, St3ps, shelf width 180-200 mm, shelf thickness 11-30 mm | t | ||||||||||
| KAVO-PU-KATO-KARI_KAKAKARI | Hot-rolled smooth reinforcing steel, class A-I, diameter 6-22 mm | t | ||||||||||
| MEME-ME-KATO-KANE_KAKALIVO | Edged softwood boards, natural moisture content, length RI-NE.SA m, width 100-250 mm, thickness 44-50 mm, grade II | m3 | ||||||||||
| MEPU-ME-KAPU-KARI_KAKAKAME | Adhesive, brand 88-NP | kg | ||||||||||
| RISA-ME-KAME-KAPU_KAKATOME | Coniferous wood sleeper, untreated, for broad gauge railways, type I | pcs | ||||||||||
| DXME-KASA-KAME_KAMESA | Tower cranes, load capacity 50 tons | Machine hours | ||||||||||
| PU_MEKAKA_KAVOKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-KASA-KAME_KAMESA | Electricity: consumption METO.PUVO kW·h/machine-hour | Machine hours | ||||||||||
| DXME-KASA-KARI_KAKANE | Gantry cranes, lifting capacity 50 t | Machine hours | ||||||||||
| PU_MEKAKA_KASASA | Personnel: 2 man-hours/machine-hour | Machine hours | ||||||||||
| DXME-KASA-KARI_KAKANE | Electricity: consumption SAME.MESA kWh/machine-hour | Machine hours | ||||||||||
| DXME-KASA-KANE_KAKALI | Crawler cranes, lifting capacity 25 t | Machine hours | ||||||||||
| PU_MEKAKA_KANEKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-KANE-KAME_KAKARI | Hydraulic jacks, lifting capacity NE.TO-RISA t | Machine hours | ||||||||||
| DXME-KANE-KATO_KASANE | Electric winches with a pulling force of LIVO.PUVO kN (8 t) | Machine hours | ||||||||||
| PU_MEKAKA_KATOKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-KANE-KATO_KASANE | Electricity: consumption KA.SATO kW·h/machine-hour | Machine hours | ||||||||||
| DXME-MEPU-KARI_KAKARI | Trucks, load capacity up to 8 tons | Machine hours | ||||||||||
| PU_MEKAKA_KAPUKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-MELI-KAPU_KAPURI | Gas welding and cutting equipment | Machine hours | ||||||||||
| DXME-MELI-KAPU_RITOTO | Welding machines for manual arc welding, welding current up to 350 A | Machine hours | ||||||||||
| DXME-MELI-KAPU_RITOTO | Electricity: consumption TO.LI kWh/machine-hour | Machine hours | ||||||||||
|
CO₂ (kg) — Zusammenfassung
|
||||||||||||
|
CO₂ (kg) wird analysiert...
|
||||||||||||
|
Reg. Price — Zusammenfassung
|
||||||||||||
|
Reg. Price wird analysiert...
|
||||||||||||
|
Alternative — Zusammenfassung
|
||||||||||||
|
Alternative wird analysiert...
|
||||||||||||
|
Optimization — Zusammenfassung
|
||||||||||||
|
Optimization wird analysiert...
|
||||||||||||
|
Where to Buy — Zusammenfassung
|
||||||||||||
|
Where to Buy wird analysiert...
|
||||||||||||
|
Safety / PPE — Zusammenfassung
|
||||||||||||
|
Safety / PPE wird analysiert...
|
||||||||||||
approx.
| kWh | ||||||
|---|---|---|---|---|---|---|
|
KI
|
- | |||||