AI
CSI
NRM2
Workers
Quick Facts
Total Cost
0
Workers/Unit
h
Labor Hours
0
Resources
0
Machines
0
Steps
KI
Work Steps
Generating image...
15-30 seconds
Error
:
|
CO₂ (kg)
|
|
Alternative
|
Optimization
|
Where to Buy
|
Safety / PPE
|
|||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| ME_MEKAKA_TOME | Worker Category 1 | hrs | ||||||||||
| KAME-LI-KATO-KAME_KAKAKAME | Water | m3 | ||||||||||
| KAME-LI-KANE-KARI_KAKAMEKA | Hydrophilic rubber swelling profile for sealing and waterproofing joints and seams in concrete structures, dimensions 20x4 mm | m | ||||||||||
| KAME-LI-MEPU-KAME_KAKAKARI | Polyurethane foam sealant (assembly foam), universal, volume 1000 ml | pcs | ||||||||||
| KAPU-TO-KARI-KADX_MEKASANE | Non-shrinking, fast-setting dry mixes for restoration, waterproofing, and repair of concrete coatings, with 3 mm aggregate, M500 | kg | ||||||||||
| MERI-RI-KALI-KASA_KAKAPUPU | Thermal insulation tubes made of foamed polyethylene, inner diameter 30 mm, thickness 9 mm | 100 m | ||||||||||
| MEPU-RI-KASA-KASA_KAKAKAVO | Two-component cement-based waterproofing compound with polymer emulsion for protecting the surface of concrete and brick structures, F600, W20, consumption ME.RI-ME.LI kg/m2 with a layer thickness of 1 mm | kg | ||||||||||
| MEPU-TO-KAME-KAME_KAKAKAME | Adhesive primer for treating dense, smooth, slightly absorbent and non-absorbent substrates | kg | ||||||||||
| DXME-MEPU-KARI_KAKAME | Flatbed trucks, load capacity up to 5 tons | Machine hours | ||||||||||
| PU_MEKAKA_KAPUKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
|
CO₂ (kg) — Zusammenfassung
|
||||||||||||
|
CO₂ (kg) wird analysiert...
|
||||||||||||
|
Reg. Price — Zusammenfassung
|
||||||||||||
|
Reg. Price wird analysiert...
|
||||||||||||
|
Alternative — Zusammenfassung
|
||||||||||||
|
Alternative wird analysiert...
|
||||||||||||
|
Optimization — Zusammenfassung
|
||||||||||||
|
Optimization wird analysiert...
|
||||||||||||
|
Where to Buy — Zusammenfassung
|
||||||||||||
|
Where to Buy wird analysiert...
|
||||||||||||
|
Safety / PPE — Zusammenfassung
|
||||||||||||
|
Safety / PPE wird analysiert...
|
||||||||||||
approx.
| kWh | ||||||
|---|---|---|---|---|---|---|
|
KI
|
- | |||||