AI
Workers
Use this position in your own project
The price above is a reference benchmark. OpenConstructionERP lets you reuse this position in a full project estimate — with your regional prices, quantities and margins.
KI
Work Steps
Generating image...
15-30 seconds
Error
:
|
CO₂ (kg)
|
|
Alternative
|
Optimization
|
Where to Buy
|
Safety / PPE
|
|||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| ME_MEKAKA_PUKA | Worker Category 1 | hrs | ||||||||||
| KAME-TO-KARI-KARI_KAKAKAME | Gaseous argon, grade I | m3 | ||||||||||
| KAME-TO-KATO-KARI_KAKAKARI | Concentrated nitric acid with a base content of DXVO.RI%, grade I | t | ||||||||||
| KAME-TO-KASA-RITO_KAKANEME | Caustic soda, grade TD, technical | t | ||||||||||
| KAME-LI-MEME-KAPU_KAKAKARI | PP-Np-19ST powder surfacing wire, diameter 3 mm | t | ||||||||||
| KAME-LI-MEME-KALI_KARIRILI | Welding electrodes for welding low-alloy and carbon steels UONI 13/45, E42A, diameter 4-5 mm | kg | ||||||||||
| KAME-LI-MESA-KANE_KAMERIME | Steel construction nails, diameter ME.NE mm, length 50 mm | t | ||||||||||
| MEME-ME-KATO-KASA_KAKANESA | Unedged coniferous boards, natural moisture content, length RI-NE.SA m, width 100-250, thickness 30-50 mm, grade III | m3 | ||||||||||
| MEPU-PU-KARI-KAPU_KAMEPURI | MA-0115 oil paint, mummy, iron minium | kg | ||||||||||
| MEPU-SA-KADX-KAME_KAKAKATO | Technical acetone, highest grade | kg | ||||||||||
| MEPU-SA-KADX-KALI_KAKARILI | Solvent No. 649 | t | ||||||||||
| RIME-RI-KAME-KARI_KAMEPUME | Uninsulated wire for overhead power lines M 4 | t | ||||||||||
| RISA-ME-KAME-KAPU_KAKATOME | Coniferous wood sleeper, untreated, for broad gauge railways, type I | pcs | ||||||||||
| DXME-KASA-KAPU_KAMEKA | Electric bridge cranes, load capacity 50 t | Machine hours | ||||||||||
| PU_MEKAKA_KASAKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-KASA-KAPU_KAMEKA | Electricity: consumption PUNE.LI kW·h/machine-hour | Machine hours | ||||||||||
| DXME-KASA-KASA_KAMESA | Mobile cranes, lifting capacity 16 t | Machine hours | ||||||||||
| PU_MEKAKA_KANEKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-KANE-KATO_KASAVO | Electric winches with a pulling force of MESANE.DXNE kN (16 t) | Machine hours | ||||||||||
| PU_MEKAKA_KATOKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-KANE-KATO_KASAVO | Electricity: consumption KA.NETO kWh/machine-hour | Machine hours | ||||||||||
| DXME-MEPU-KARI_KAKAME | Flatbed trucks, load capacity up to 5 tons | Machine hours | ||||||||||
| PU_MEKAKA_KAPUKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-MELI-KAPU_MENEME | Welding machine for semi-automatic welding, welding current up to 500 A, complete with wire feed mechanism | Machine hours | ||||||||||
| DXME-MELI-KAPU_MENEME | Electricity: consumption VO.DXVO kW·h/machine-hour | Machine hours | ||||||||||
|
CO₂ (kg) — Zusammenfassung
|
||||||||||||
|
CO₂ (kg) wird analysiert...
|
||||||||||||
|
Reg. Price — Zusammenfassung
|
||||||||||||
|
Reg. Price wird analysiert...
|
||||||||||||
|
Alternative — Zusammenfassung
|
||||||||||||
|
Alternative wird analysiert...
|
||||||||||||
|
Optimization — Zusammenfassung
|
||||||||||||
|
Optimization wird analysiert...
|
||||||||||||
|
Where to Buy — Zusammenfassung
|
||||||||||||
|
Where to Buy wird analysiert...
|
||||||||||||
|
Safety / PPE — Zusammenfassung
|
||||||||||||
|
Safety / PPE wird analysiert...
|
||||||||||||
approx.
| kWh | ||||||
|---|---|---|---|---|---|---|
|
KI
|
- | |||||