AI
Workers
Use this position in your own project
The price above is a reference benchmark. OpenConstructionERP lets you reuse this position in a full project estimate — with your regional prices, quantities and margins.
KI
Work Steps
Generating image...
15-30 seconds
Error
:
|
CO₂ (kg)
|
|
Alternative
|
Optimization
|
Where to Buy
|
Safety / PPE
|
|||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| ME_MEKAKA_PUPU | Worker Category 1 | hrs | ||||||||||
| KAME-TO-KARI-KARI_KAKAKARI | Argon gas, highest grade | m3 | ||||||||||
| KAME-TO-KARI-KAVO_KAKAKAME | Technical gaseous oxygen | m3 | ||||||||||
| KAME-TO-KARI-KADX_KAKARIRI | Propane-butane technical mixture | kg | ||||||||||
| KAME-TO-KATO-KALI_KAKAKAME | Acetic acid | kg | ||||||||||
| KAME-LI-KATO-KAME_KAKAKARI | Tap water | m3 | ||||||||||
| KAME-LI-KATO-KAPU_KAKAKAME | Electricity | kWh | ||||||||||
| KAME-LI-KALI-RIPU_KAKAMEKA | Two-component developer for processing radiographic film, solution temperature for manual/automated processing 22/28 °C, development time 5-8 min, consumption KA.VO l/m2 | l | ||||||||||
| KAME-LI-KALI-RIPU_KAKARIKA | Two-component fixer for processing radiographic film, solution temperature for manual/automated processing 22/28 °C, fixing time 5-10 min, consumption KA.VO l/m2 | l | ||||||||||
| KAME-LI-MEME-KAPU_KAKASARI | Uncoated welding wire SV-08G2S, diameter 2 mm | kg | ||||||||||
| KAME-LI-MEME-KALI_KARIMETO | Welding electrodes for welding low-alloy and carbon steels TMU-21U, E50A, diameter 3-5 mm | kg | ||||||||||
| KAME-LI-MEME-KALI_KARIPUPU | Welding electrodes for welding alloyed high-strength and heat-resistant steels TsU-5, diameter RI.SA mm | kg | ||||||||||
| KAME-LI-MEME-KALI_KATOMETO | Tungsten welding electrodes for welding high-alloy and refractory steels | kg | ||||||||||
| DXME-KASA-KARI_KAKASA | Gantry cranes, lifting capacity 32 t | Machine hours | ||||||||||
| PU_MEKAKA_KANEKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-KASA-KARI_KAKASA | Electricity: consumption TONE.TO kW·h/machine-hour | Machine hours | ||||||||||
| DXME-KASA-KARI_KAKANE | Gantry cranes, lifting capacity 50 t | Machine hours | ||||||||||
| PU_MEKAKA_KASASA | Personnel: 2 man-hours/machine-hour | Machine hours | ||||||||||
| DXME-KASA-KARI_KAKANE | Electricity: consumption SAME.MESA kWh/machine-hour | Machine hours | ||||||||||
| DXME-KASA-KAPU_KAMEKA | Electric bridge cranes, load capacity 50 t | Machine hours | ||||||||||
| PU_MEKAKA_KASAKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-KASA-KAPU_KAMEKA | Electricity: consumption PUNE.LI kW·h/machine-hour | Machine hours | ||||||||||
| DXME-KADX-KATO_KATOSA | Wide gauge platforms, load capacity 73 t | Machine hours | ||||||||||
| DXME-KADX-KASA_KARIRI | Broad gauge shunting locomotives, power 550 kW (750 hp) | Machine hours | ||||||||||
| PU_MEKAKA_KASAKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-MELI-KARI_KAKARI | Portable X-ray pulse devices for X-raying metal up to 30 mm thick | Machine hours | ||||||||||
| DXME-MELI-KARI_KARIME | Gamma flaw detectors with a penetrable steel thickness of up to 80 mm | Machine hours | ||||||||||
| DXME-MELI-KARI_KATORI | Ultrasonic flaw detectors, thickness of the product being inspected up to 6000 mm | Machine hours | ||||||||||
| DXME-MELI-KAPU_RITOTO | Welding machines for manual arc welding, welding current up to 350 A | Machine hours | ||||||||||
| DXME-MELI-KAPU_RITOTO | Electricity: consumption TO.LI kWh/machine-hour | Machine hours | ||||||||||
| DXME-MEVO-KAME_SAKAVO | Mobile screw compressors with electric motor, pressure up to 1 MPa (10 atm), capacity up to 5 m3/min | Machine hours | ||||||||||
| DXME-MEVO-KAME_SAKAVO | Electricity: consumption MERI.RIME kW·h/machine-hour | Machine hours | ||||||||||
| DXME-MEDX-KAVO_KAMESA | Pumps, capacity 200 m3/h, head 25 m, power 22 kW | Machine hours | ||||||||||
| DXME-MEDX-KAVO_KAMESA | Electricity: consumption LI.RINE kW·h/machine-hour | Machine hours | ||||||||||
| DXME-RIME-MEDX_KATONE | Pipe cutting machines, maximum pipe diameter 426 mm | Machine hours | ||||||||||
| PU_MEKAKA_KAPUKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-RIME-MEDX_KATONE | Electricity: consumption ME.VORI kW·h/machine-hour | Machine hours | ||||||||||
|
CO₂ (kg) — Zusammenfassung
|
||||||||||||
|
CO₂ (kg) wird analysiert...
|
||||||||||||
|
Reg. Price — Zusammenfassung
|
||||||||||||
|
Reg. Price wird analysiert...
|
||||||||||||
|
Alternative — Zusammenfassung
|
||||||||||||
|
Alternative wird analysiert...
|
||||||||||||
|
Optimization — Zusammenfassung
|
||||||||||||
|
Optimization wird analysiert...
|
||||||||||||
|
Where to Buy — Zusammenfassung
|
||||||||||||
|
Where to Buy wird analysiert...
|
||||||||||||
|
Safety / PPE — Zusammenfassung
|
||||||||||||
|
Safety / PPE wird analysiert...
|
||||||||||||
approx.
| kWh | ||||||
|---|---|---|---|---|---|---|
|
KI
|
- | |||||