AI
Workers
Use this position in your own project
The price above is a reference benchmark. OpenConstructionERP lets you reuse this position in a full project estimate — with your regional prices, quantities and margins.
KI
Work Steps
Generating image...
15-30 seconds
Error
:
|
CO₂ (kg)
|
|
Alternative
|
Optimization
|
Where to Buy
|
Safety / PPE
|
|||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| ME_MEKAKA_TOKA | Average workload TO.KA | hrs | ||||||||||
| KAME-LI-MESA-MEPU_KAMENESA | Self-tapping steel screws with a semi-circular head and a straight slot, pointed, diameter 4 mm, length 40 mm | t | ||||||||||
| MEKA-TO-KARI-KATO_KAKAMERI | Tin-lead solder without antimony, grade POS40 | kg | ||||||||||
| RIME-RI-KATO-KADX_KAMEKAME | Power cable APRN 1x35-660 | 1000 m | ||||||||||
| RIPU-TO-KATO-KAME_KAMEKAME | Polyethylene tube, diameter 6-10 mm | 10 m | ||||||||||
| DXME-KANE-KATO_KANEKA | Electric winches with a pulling force of up to SA.LIDX kN (KA.SADX t) | Machine hours | ||||||||||
| DXME-KANE-KASA_KAMEME | Universal front-end pneumatic wheeled single-bucket loaders, nominal capacity of main bucket RI.NE m3, load capacity 5 t | Machine hours | ||||||||||
| PU_MEKAKA_KASAKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
|
CO₂ (kg) — Zusammenfassung
|
||||||||||||
|
CO₂ (kg) wird analysiert...
|
||||||||||||
|
Reg. Price — Zusammenfassung
|
||||||||||||
|
Reg. Price wird analysiert...
|
||||||||||||
|
Alternative — Zusammenfassung
|
||||||||||||
|
Alternative wird analysiert...
|
||||||||||||
|
Optimization — Zusammenfassung
|
||||||||||||
|
Optimization wird analysiert...
|
||||||||||||
|
Where to Buy — Zusammenfassung
|
||||||||||||
|
Where to Buy wird analysiert...
|
||||||||||||
|
Safety / PPE — Zusammenfassung
|
||||||||||||
|
Safety / PPE wird analysiert...
|
||||||||||||
approx.
| kWh | ||||||
|---|---|---|---|---|---|---|
|
KI
|
- | |||||