| RIPU-TO-KATO-METO | Polyethylene pipes | m | ||||||||||
| ME_MEKAKA_PUNE | Worker Category 1 | hrs | ||||||||||
| MEME-ME-KATO-KAME_KAKANELI | Edged softwood timber (spruce, pine), natural moisture content, length RI-NE.SA m, width 100 mm and above, thickness 100 mm and above, grade III | m3 | ||||||||||
| DXME-KASA-KASA_KAMESA | Mobile cranes, lifting capacity 16 t | Machine hours | ||||||||||
| PU_MEKAKA_KANEKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-KANE-KATO_KATODX | Hydraulic trailer winches with internal combustion engines for cleaning the inner surface of pipelines, traction force 200 kN (20 t) | Machine hours | ||||||||||
| PU_MEKAKA_KATOKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-MEPU-KARI_KAKAME | Flatbed trucks, load capacity up to 5 tons | Machine hours | ||||||||||
| PU_MEKAKA_KAPUKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-MELI-KAPU_KASAPU | Machines with automatic control of the butt welding process for plastic pipes with a diameter of over 160 to 315 mm | Machine hours | ||||||||||
| DXME-MELI-KAPU_KASAPU | Electricity: consumption ME.MEPU kW·h/machine-hour | Machine hours | ||||||||||
| DXME-MEVO-KAME_KAKAPU | Mobile screw compressors with internal combustion engines, pressure up to 1 MPa (10 atm), capacity up to 10 m3/min | Machine hours | ||||||||||
| PU_MEKAKA_KAPUKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-RIME-MESA_KAKAME | Petrol cutters, engine power 3 kW (4 hp) | Machine hours | ||||||||||
| DXME-RIME-MELI_KAKARI | Pneumatic breakers for trenchless replacement of pipes with a diameter of 200 to 355 mm when operating from mobile compressor units | Machine hours | ||||||||||
|
CO₂ (kg) — Zusammenfassung
|
||||||||||||
|
CO₂ (kg) wird analysiert...
|
||||||||||||
|
Reg. Price — Zusammenfassung
|
||||||||||||
|
Reg. Price wird analysiert...
|
||||||||||||
|
Alternative — Zusammenfassung
|
||||||||||||
|
Alternative wird analysiert...
|
||||||||||||
|
Optimization — Zusammenfassung
|
||||||||||||
|
Optimization wird analysiert...
|
||||||||||||
|
Where to Buy — Zusammenfassung
|
||||||||||||
|
Where to Buy wird analysiert...
|
||||||||||||
|
Safety / PPE — Zusammenfassung
|
||||||||||||
|
Safety / PPE wird analysiert...
|
||||||||||||
approx.
| kWh | ||||||
|---|---|---|---|---|---|---|
|
KI
|
- | |||||