AI
Workers
Use this position in your own project
The price above is a reference benchmark. OpenConstructionERP lets you reuse this position in a full project estimate — with your regional prices, quantities and margins.
KI
Work Steps
Generating image...
15-30 seconds
Error
:
|
CO₂ (kg)
|
|
Alternative
|
Optimization
|
Where to Buy
|
Safety / PPE
|
|||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| KAME-PU-KARI-KARI | Rock cutters | pcs | ||||||||||
| KAME-PU-KARI-KATO | Cutting elements | pcs | ||||||||||
| KAME-PU-KATO-KAME | Bentonite powders | kg | ||||||||||
| KAME-PU-KATO-KATO | Polymers for drilling | t | ||||||||||
| KASA-ME-KARI-KAVO | Reinforced concrete pipes | m | ||||||||||
| RI_MEKAKA_KARI | 2nd grade worker | hrs | ||||||||||
| RI_MEKAKA_KASA | Grade 5 worker | hrs | ||||||||||
| KAME-LI-KATO-KAME_KAKAKAME | Water | m3 | ||||||||||
| DXME-KATO-KASA_KALIPU | Microtunneling complexes, maximum outer diameter of pipe (lining) TO.KA m, tunneling length from 200 m to 500 m | Machine hours | ||||||||||
| PU_MEKAKA_KAVOKA | Personnel: 3 man-hours/machine-hours | Machine hours | ||||||||||
| DXME-KASA-KADX_SAKARI | Cranes on special automotive chassis, lifting capacity 100 t | Machine hours | ||||||||||
| PU_MEKAKA_KAVOSA | Personnel: 2 man-hours/machine-hour | Machine hours | ||||||||||
| DXME-MEPU-KARI_KAKANE | Flatbed trucks, load capacity up to 20 tons | Machine hours | ||||||||||
| PU_MEKAKA_KASAKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-MENE-KAME_KAKALI | Mobile power stations, capacity 200 kW | Machine hours | ||||||||||
| PU_MEKAKA_KALIKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-MENE-KATO_KAKAME | Stationary power plants, capacity 1000 kW | Machine hours | ||||||||||
|
CO₂ (kg) — Zusammenfassung
|
||||||||||||
|
CO₂ (kg) wird analysiert...
|
||||||||||||
|
Reg. Price — Zusammenfassung
|
||||||||||||
|
Reg. Price wird analysiert...
|
||||||||||||
|
Alternative — Zusammenfassung
|
||||||||||||
|
Alternative wird analysiert...
|
||||||||||||
|
Optimization — Zusammenfassung
|
||||||||||||
|
Optimization wird analysiert...
|
||||||||||||
|
Where to Buy — Zusammenfassung
|
||||||||||||
|
Where to Buy wird analysiert...
|
||||||||||||
|
Safety / PPE — Zusammenfassung
|
||||||||||||
|
Safety / PPE wird analysiert...
|
||||||||||||
approx.
| kWh | ||||||
|---|---|---|---|---|---|---|
|
KI
|
- | |||||