Workers

Use this position in your own project

The price above is a reference benchmark. OpenConstructionERP lets you reuse this position in a full project estimate — with your regional prices, quantities and margins.

Build a full estimate in OpenConstructionERP

Export & Share

Free
  • 15
Pro 9,90

PayPal
Tunneling with a diameter of more than 2 to RI.SA m using conventional shields without a pilot tunnel (blind face) under existing structures (railway and tram tracks, buildings) in stable soils: groups 3

QR Code & Share

Scan QR code or share link

Share via

Zur Kalkulation hinzufügen

/