AI
Workers
Use this position in your own project
The price above is a reference benchmark. OpenConstructionERP lets you reuse this position in a full project estimate — with your regional prices, quantities and margins.
KI
Work Steps
Generating image...
15-30 seconds
Error
:
|
CO₂ (kg)
|
|
Alternative
|
Optimization
|
Where to Buy
|
Safety / PPE
|
|||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| ME_MEKAKA_TOSA | Worker Category 1 | hrs | ||||||||||
| KAME-PU-KATO-KAPU_KAKAMEME | Hexagonal hollow drill steel 55S2, outer size 22 mm, inner diameter NE.SA mm | t | ||||||||||
| KAME-LI-KANE-KATO_KAKARITO | Polyethylene tapes with adhesive layer, transparent, width 20 mm, thickness KA.KAVO mm | kg | ||||||||||
| KAME-LI-KALI-RIRI_KAKAMEME | Coal, grade A | t | ||||||||||
| KAME-LI-KADX-KAME_KAKAKARI | Ammonite 6ZhV in powder form | t | ||||||||||
| KAME-LI-KADX-KARI_KAKATOTO | ED-ZD electric detonators | 1000 pcs | ||||||||||
| KAME-LI-KADX-KATO_KAKAKAME | APRN wire for blasting operations, VP brand | 1000 m | ||||||||||
| KAME-LI-KADX-KATO_KAKAMEME | Detonating cord | 1000 m | ||||||||||
| KAME-LI-RIKA-KAVO_KAKAPUME | Three-strand twisted rope made of hemp fiber, diameter from 6 to 22 mm | t | ||||||||||
| KAVO-TO-KASA-KASA_KAKATOME | Roofing sheet steel, grade STK-1, thickness KA.SA mm | t | ||||||||||
| MEKA-PU-KAME-KAME_KAKAKARI | Tin-zinc solders, zinc content 10% | kg | ||||||||||
| MEPU-RI-KAPU-KAME_KAKAKAME | Coal tar for road construction | t | ||||||||||
| RITO-TO-KAME-KAPU_KAKAMEVO | Seamless casing pipes made of Group D steel, with short triangular thread, outer diameter 168 mm, wall thickness LI.TO-MERI.ME mm | t | ||||||||||
| DXME-KAPU-KAME_KAPUSA | Heavy drilling hammers for use with mobile compressor units | Machine hours | ||||||||||
| DXME-KAPU-KATO_KAMEME | Impact-rope drilling rigs on wheeled chassis, drilling depth up to 50 m, load capacity RI.NE t | Machine hours | ||||||||||
| PU_MEKAKA_KASAKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-MEVO-KAME_KAKALI | Mobile screw compressors with internal combustion engines, pressure up to KA.LI MPa (7 atm), capacity up to SA.PU m3/min | Machine hours | ||||||||||
| PU_MEKAKA_KAPUKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-RIKA-KAME_KARIME | Hydraulic soil washing and suction units | Machine hours | ||||||||||
| PU_MEKAKA_KANEKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-RIKA-KATO_KAKAME | Tugs, power 110 kW (150 hp) | Machine hours | ||||||||||
| PU_MEKAKA_KASAKA | Personnel: 3 man-hours/machine-hours | Machine hours | ||||||||||
| DXME-RIKA-MEKA_KAKAPU | Floating platforms, collapsible, load capacity 29 t | Machine hours | ||||||||||
| DXME-RIKA-METO_KAKAME | Diving stations on a self-propelled boat, power 110 kW (150 hp) with compressor | Machine hours | ||||||||||
| PU_MEKAKA_KANEVO | Personnel: 6 people-hours/machine-hours | Machine hours | ||||||||||
| DXME-RIME-MEDX_KAMERI | Drill bit sharpening machines | Machine hours | ||||||||||
|
CO₂ (kg) — Zusammenfassung
|
||||||||||||
|
CO₂ (kg) wird analysiert...
|
||||||||||||
|
Reg. Price — Zusammenfassung
|
||||||||||||
|
Reg. Price wird analysiert...
|
||||||||||||
|
Alternative — Zusammenfassung
|
||||||||||||
|
Alternative wird analysiert...
|
||||||||||||
|
Optimization — Zusammenfassung
|
||||||||||||
|
Optimization wird analysiert...
|
||||||||||||
|
Where to Buy — Zusammenfassung
|
||||||||||||
|
Where to Buy wird analysiert...
|
||||||||||||
|
Safety / PPE — Zusammenfassung
|
||||||||||||
|
Safety / PPE wird analysiert...
|
||||||||||||
approx.
| kWh | ||||||
|---|---|---|---|---|---|---|
|
KI
|
- | |||||