AI
Workers
Use this position in your own project
The price above is a reference benchmark. OpenConstructionERP lets you reuse this position in a full project estimate — with your regional prices, quantities and margins.
KI
Work Steps
Generating image...
15-30 seconds
Error
:
|
CO₂ (kg)
|
|
Alternative
|
Optimization
|
Where to Buy
|
Safety / PPE
|
|||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| ME_MEKAKA_PUKA | Worker Category 1 | hrs | ||||||||||
| KAME-LI-KARI-KALI_KAKAMEME | Pressboard, grade A | kg | ||||||||||
| KAME-LI-KANE-KASA_KAKAPURI | PVC insulating tape for electrical installation and repair work, black, width 19 mm, thickness KA.MEVO mm | m | ||||||||||
| KAME-LI-MESA-KARI_KAKAVORI | Steel bolts with hexagonal heads, thread diameter M8 (M10, M12, M14), length 16-160 mm | t | ||||||||||
| KAME-LI-MESA-KAPU_KAKAMEME | Steel screws with a semi-circular head, length 50 mm | t | ||||||||||
| KAME-LI-RIKA-KAPU_KAKAKATO | Polyester bag sewing thread made of staple lavsan (raw) | kg | ||||||||||
| KAVO-TO-KATO-KAPU_KAKAMERI | Light wire, diameter ME.ME mm | t | ||||||||||
| KAVO-TO-KALI-KAME_KAKANEKA | Hot-rolled steel strip, steel grades St3sp, St3ps, dimensions 100x10 mm | t | ||||||||||
| MEKA-TO-KARI-KATO_KAKAMEME | Tin-lead solder without antimony, grade POS30 | kg | ||||||||||
| MEME-ME-KARI-KAPU_KAKATOME | Round coniferous timber, unpeeled, length TO-NE.SA m, diameter 14-24 cm, grade II-III | m3 | ||||||||||
| MEPU-PU-KATO-KANE_KAKAKAME | ML-92 electrical insulation varnish | kg | ||||||||||
| RIKA-RI-MEKA-KATO_KAKARIKA | Copper cable lugs P RI.SA-PU | 100 pcs | ||||||||||
| RIPU-TO-KAME-KAME_KAKAKAPU | PVC-305 electrical insulation tube, diameter 6-10 mm | kg | ||||||||||
| DXME-KANE-KASA_KAMEME | Universal front-end pneumatic wheeled single-bucket loaders, nominal capacity of main bucket RI.NE m3, load capacity 5 t | Machine hours | ||||||||||
| PU_MEKAKA_KASAKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
|
CO₂ (kg) — Zusammenfassung
|
||||||||||||
|
CO₂ (kg) wird analysiert...
|
||||||||||||
|
Reg. Price — Zusammenfassung
|
||||||||||||
|
Reg. Price wird analysiert...
|
||||||||||||
|
Alternative — Zusammenfassung
|
||||||||||||
|
Alternative wird analysiert...
|
||||||||||||
|
Optimization — Zusammenfassung
|
||||||||||||
|
Optimization wird analysiert...
|
||||||||||||
|
Where to Buy — Zusammenfassung
|
||||||||||||
|
Where to Buy wird analysiert...
|
||||||||||||
|
Safety / PPE — Zusammenfassung
|
||||||||||||
|
Safety / PPE wird analysiert...
|
||||||||||||
approx.
| kWh | ||||||
|---|---|---|---|---|---|---|
|
KI
|
- | |||||