AI
Workers
KI
Work Steps
Generating image...
15-30 seconds
Error
:
|
CO₂ (kg)
|
|
Alternative
|
Optimization
|
Where to Buy
|
Safety / PPE
|
|||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| MERI-ME-KARI-KATO | Polyester-based bitumen-polymer materials | m2 | ||||||||||
| RI_MEKAKA_KAPU | Grade 4 worker | hrs | ||||||||||
| KAME-RI-KATO-KATO_KAKANESA | Bitumen-rubber insulating mastic MBR-90 | t | ||||||||||
| KAME-TO-KARI-KADX_KAKARIRI | Propane-butane technical mixture | kg | ||||||||||
| KAME-LI-KATO-KAME_KAKAKAME | Water | m3 | ||||||||||
| KAME-LI-KATO-KAPU_KAKAKAME | Electricity | kWh | ||||||||||
| KAME-LI-KALI-RINE_KAKAPUKA | Foam polyethylene thermal insulation sealing cord, round solid cross-section, density 25-40 kg/m3, diameter 50 mm | 100 m | ||||||||||
| KAME-LI-MELI-KALI_KAKASARI | Straight profile grinding wheel, grinding material grade 25A, dimensions 150x20x32 mm | pcs | ||||||||||
| KARI-TO-KAME-KALI_KAKAKANE | Quartz sand, fraction KA-KA.NETO mm | m3 | ||||||||||
| KAPU-TO-KARI-KADX_MEKAKANE | Dry concrete mixes, non-shrinking, fast-setting, containing polymer and rigid steel fibers, for repairing concrete and reinforced concrete elements of bridge structures, airfield and road pavements subject to dynamic and impact loads, aggregate size 10 mm | kg | ||||||||||
| DXME-MEVO-KAME_KAKAVO | Mobile screw compressors with internal combustion engines, pressure up to KA.LI MPa (7 atm), capacity up to 12 m3/min | Machine hours | ||||||||||
| PU_MEKAKA_KASAKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-RIME-KATO_SAKARI | Sandblasting machines operating from mobile compressor units, volume up to 19 l, air consumption 270-700 l/min | Machine hours | ||||||||||
|
CO₂ (kg) — Zusammenfassung
|
||||||||||||
|
CO₂ (kg) wird analysiert...
|
||||||||||||
|
Reg. Price — Zusammenfassung
|
||||||||||||
|
Reg. Price wird analysiert...
|
||||||||||||
|
Alternative — Zusammenfassung
|
||||||||||||
|
Alternative wird analysiert...
|
||||||||||||
|
Optimization — Zusammenfassung
|
||||||||||||
|
Optimization wird analysiert...
|
||||||||||||
|
Where to Buy — Zusammenfassung
|
||||||||||||
|
Where to Buy wird analysiert...
|
||||||||||||
|
Safety / PPE — Zusammenfassung
|
||||||||||||
|
Safety / PPE wird analysiert...
|
||||||||||||
approx.
| kWh | ||||||
|---|---|---|---|---|---|---|
|
KI
|
- | |||||