AI
CSI
NRM2
Workers
Quick Facts
Total Cost
0
Workers/Unit
h
Labor Hours
0
Resources
0
Machines
0
Steps
KI
Work Steps
Generating image...
15-30 seconds
Error
:
|
CO₂ (kg)
|
|
Alternative
|
Optimization
|
Where to Buy
|
Safety / PPE
|
|||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| ME_MEKAKA_TODX | Worker Category 1 | hrs | ||||||||||
| KAME-LI-KATO-KAPU_KAKAKAME | Electricity | kWh | ||||||||||
| KAME-LI-KANE-KAME_KAKAKASA | Waterproofing and vapor barrier tapes made of butyl rubber, laminated with non-woven material on one side, with an adhesive layer on one side and an anti-adhesive coating on the other, beige color, width 100 mm, thickness 2 mm | m | ||||||||||
| KAME-LI-KALI-MEKA_KAKAKAME | Cartridges for construction and installation gun, red tip, length 10-18 mm | 1000 pcs | ||||||||||
| KAME-LI-MERI-KASA_KAMENESA | Nonwoven geotextile for road construction, needle-punched, surface density 500 g/m2 | m2 | ||||||||||
| KAME-LI-MEPU-KALI_MEKAKAPU | PVC plastic waterproofing, sheet or roll, thickness 1-5 mm | t | ||||||||||
| KAME-LI-MESA-KALI_KAKAKATO | Galvanized steel dowel nails with washers for a mounting gun, diameter PU.SA mm, length 30-50 mm | 10 pcs | ||||||||||
| MEME-TO-KATO-MESA_MEKAKANE | PVC roundels, outer diameter 75 mm, inner diameter 25 mm, thickness 10 mm | 10 pcs | ||||||||||
| DXME-MEPU-KARI_KAKAME | Flatbed trucks, load capacity up to 5 tons | Machine hours | ||||||||||
| PU_MEKAKA_KAPUKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-MELI-KAPU_KAKAME | Automatic welding machines for polymer coatings, power PU.NE kW | Machine hours | ||||||||||
| DXME-MELI-KAPU_KAKAME | Electricity: consumption ME.SARI kW·h/machine-hour | Machine hours | ||||||||||
| DXME-MEVO-KAME_KAKALI | Mobile screw compressors with internal combustion engines, pressure up to KA.LI MPa (7 atm), capacity up to SA.PU m3/min | Machine hours | ||||||||||
| PU_MEKAKA_KAPUKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
|
CO₂ (kg) — Zusammenfassung
|
||||||||||||
|
CO₂ (kg) wird analysiert...
|
||||||||||||
|
Reg. Price — Zusammenfassung
|
||||||||||||
|
Reg. Price wird analysiert...
|
||||||||||||
|
Alternative — Zusammenfassung
|
||||||||||||
|
Alternative wird analysiert...
|
||||||||||||
|
Optimization — Zusammenfassung
|
||||||||||||
|
Optimization wird analysiert...
|
||||||||||||
|
Where to Buy — Zusammenfassung
|
||||||||||||
|
Where to Buy wird analysiert...
|
||||||||||||
|
Safety / PPE — Zusammenfassung
|
||||||||||||
|
Safety / PPE wird analysiert...
|
||||||||||||
approx.
| kWh | ||||||
|---|---|---|---|---|---|---|
|
KI
|
- | |||||