AI
Workers
Use this position in your own project
The price above is a reference benchmark. OpenConstructionERP lets you reuse this position in a full project estimate — with your regional prices, quantities and margins.
KI
Work Steps
Generating image...
15-30 seconds
Error
:
|
CO₂ (kg)
|
|
Alternative
|
Optimization
|
Where to Buy
|
Safety / PPE
|
|||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| ME_MEKAKA_SAME | Worker Category 1 | hrs | ||||||||||
| KAME-LI-MEME-KALI_KAMEVOTO | Welding electrodes for welding low-alloy and carbon steels UONI 13/55, E50A, diameter 3 mm | t | ||||||||||
| KAME-LI-MEME-KALI_KAMEVOSA | Welding electrodes for welding low-alloy and carbon steels E60A, diameter 4 mm | t | ||||||||||
| MEME-ME-KATO-KAME_KAKANELI | Edged softwood timber (spruce, pine), natural moisture content, length RI-NE.SA m, width 100 mm and above, thickness 100 mm and above, grade III | m3 | ||||||||||
| DXME-KAME-KAME_KATOPU | Bulldozers, power 59 kW (80 hp) | Machine hours | ||||||||||
| PU_MEKAKA_KASAKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-KAME-KAME_KATOVO | Bulldozers, power 121 kW (165 hp) | Machine hours | ||||||||||
| PU_MEKAKA_KANEKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-MEKA-KASA_KAMEME | Pipe layers, rated load capacity 92 t | Machine hours | ||||||||||
| PU_MEKAKA_KADXKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-MEKA-MEKA_KAMESA | Internal hydraulic centering devices for pipes with a diameter of 1400 mm | Machine hours | ||||||||||
| DXME-MEKA-MEME_KASAME | Devices for repairing dents in pipes with a diameter of 600-1400 mm | Machine hours | ||||||||||
| DXME-MENE-KAME_KAKAPU | Mobile power stations, capacity 60 kW | Machine hours | ||||||||||
| PU_MEKAKA_KASAKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-MENE-KAME_KAKASA | Mobile power stations, power 75 kW | Machine hours | ||||||||||
| PU_MEKAKA_KASAKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-MELI-KAME_KAKAPU | Welding rectifiers, welding current up to 500 A, number of posts 1 | Machine hours | ||||||||||
| DXME-MELI-KAME_KAKAPU | Electricity: consumption LI.DXRI kW·h/machine-hour | Machine hours | ||||||||||
|
CO₂ (kg) — Zusammenfassung
|
||||||||||||
|
CO₂ (kg) wird analysiert...
|
||||||||||||
|
Reg. Price — Zusammenfassung
|
||||||||||||
|
Reg. Price wird analysiert...
|
||||||||||||
|
Alternative — Zusammenfassung
|
||||||||||||
|
Alternative wird analysiert...
|
||||||||||||
|
Optimization — Zusammenfassung
|
||||||||||||
|
Optimization wird analysiert...
|
||||||||||||
|
Where to Buy — Zusammenfassung
|
||||||||||||
|
Where to Buy wird analysiert...
|
||||||||||||
|
Safety / PPE — Zusammenfassung
|
||||||||||||
|
Safety / PPE wird analysiert...
|
||||||||||||
approx.
| kWh | ||||||
|---|---|---|---|---|---|---|
|
KI
|
- | |||||