AI
Workers
Use this position in your own project
The price above is a reference benchmark. OpenConstructionERP lets you reuse this position in a full project estimate — with your regional prices, quantities and margins.
KI
Work Steps
Generating image...
15-30 seconds
Error
:
|
CO₂ (kg)
|
|
Alternative
|
Optimization
|
Where to Buy
|
Safety / PPE
|
|||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| KARI-TO-KAME-KARI | Natural sand for construction work | m3 | ||||||||||
| KATO-RI-KAME-KASA | Cement | t | ||||||||||
| ME_MEKAKA_PULI | Worker Category 1 | hrs | ||||||||||
| KAME-LI-KATO-KAME_KAKAKAME | Water | m3 | ||||||||||
| DXME-KATO-MEME_KAKATO | Auxiliary station trolleys | Machine hours | ||||||||||
| DXME-KANE-KATO_KATOTO | Auxiliary mine winches with a pulling force of METO.LITO kN (ME.PU t) | Machine hours | ||||||||||
| DXME-KANE-KATO_KATOTO | Electricity: consumption KA.PUNE kW·h/machine-hour | Machine hours | ||||||||||
| DXME-KALI-KATO_KARIME | Automated concrete plants, capacity 20 m3/h | Machine hours | ||||||||||
| PU_MEKAKA_KASAKA | Personnel: 7 man-hours/machine-hours | Machine hours | ||||||||||
| DXME-KALI-KATO_KARIME | Electricity: consumption MEVO.SANE kW·h/machine-hour | Machine hours | ||||||||||
| DXME-KALI-MEKA_KARIME | Pneumatic shotcrete machines with electric drive when operating from stationary compressor stations, capacity up to 7 m3/h | Machine hours | ||||||||||
| PU_MEKAKA_KATOKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-KALI-MEKA_KARIME | Electricity: consumption KA.SA kW·h/machine-hour | Machine hours | ||||||||||
|
CO₂ (kg) — Zusammenfassung
|
||||||||||||
|
CO₂ (kg) wird analysiert...
|
||||||||||||
|
Reg. Price — Zusammenfassung
|
||||||||||||
|
Reg. Price wird analysiert...
|
||||||||||||
|
Alternative — Zusammenfassung
|
||||||||||||
|
Alternative wird analysiert...
|
||||||||||||
|
Optimization — Zusammenfassung
|
||||||||||||
|
Optimization wird analysiert...
|
||||||||||||
|
Where to Buy — Zusammenfassung
|
||||||||||||
|
Where to Buy wird analysiert...
|
||||||||||||
|
Safety / PPE — Zusammenfassung
|
||||||||||||
|
Safety / PPE wird analysiert...
|
||||||||||||
approx.
| kWh | ||||||
|---|---|---|---|---|---|---|
|
KI
|
- | |||||