AI
Workers
Use this position in your own project
The price above is a reference benchmark. OpenConstructionERP lets you reuse this position in a full project estimate — with your regional prices, quantities and margins.
KI
Work Steps
Generating image...
15-30 seconds
Error
:
|
CO₂ (kg)
|
|
Alternative
|
Optimization
|
Where to Buy
|
Safety / PPE
|
|||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| RI_MEKAKA_KAME | Grade 1 worker | hrs | ||||||||||
| RI_MEKAKA_KATO | Grade 3 worker | hrs | ||||||||||
| RI_MEKAKA_KASA | Grade 5 worker | hrs | ||||||||||
| RI_MEKAKA_KANE | Grade 6 worker | hrs | ||||||||||
| KAME-PU-KAME-KANE_KAMENEPU | Pin drill bit for hydraulic perforators and rotary percussion drilling machines, internal thread R25, diameter 33 mm | Nr | ||||||||||
| KAME-PU-KARI-KAPU_MEMERIRI | Hexagonal steel drill rod, hexagon size 28 mm, shank with R32 thread, external thread R25, length 4305 mm | Nr | ||||||||||
| KAME-LI-KATO-KAME_KAKAKAME | Water | m3 | ||||||||||
| DXME-KATO-KANE_KAMETO | Loading and delivery machines with internal combustion engine on pneumatic wheels, load capacity up to 10 t | Machine hours | ||||||||||
| PU_MEKAKA_KANEKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-KATO-MEKA_KAKAVO | Hand-held pneumatic drilling machines for use with mobile compressor units, drilling diameter up to 35 mm | Machine hours | ||||||||||
| DXME-KATO-MEDX_METOKA | Single-barrel drilling rigs on pneumatic wheels, working area up to 40 m2, drilling diameter up to 76 mm, drilling depth up to 5000 mm | Machine hours | ||||||||||
| DXME-KATO-MEDX_METOKA | Electricity: consumption 20.79 kW·h/machine-hour | Machine hours | ||||||||||
| DXME-KASA-KAPU_KAKASA | Electric overhead cranes, lifting capacity 5 t | Machine hours | ||||||||||
| PU_MEKAKA_KAPUKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-KASA-KAPU_KAKASA | Electricity: consumption 2.97 kW·h/machine-hour | Machine hours | ||||||||||
| DXME-KANE-KADX_MERIME | Multifunctional auxiliary machines with scissor hydraulic platform, platform load capacity up to 1500 kg | Machine hours | ||||||||||
| PU_MEKAKA_KAPUKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-KADX-KARI_KAKAVO | Non-tipping mine cars, capacity 2.5 m3 | Machine hours | ||||||||||
|
CO₂ (kg) — Zusammenfassung
|
||||||||||||
|
CO₂ (kg) wird analysiert...
|
||||||||||||
|
Reg. Price — Zusammenfassung
|
||||||||||||
|
Reg. Price wird analysiert...
|
||||||||||||
|
Alternative — Zusammenfassung
|
||||||||||||
|
Alternative wird analysiert...
|
||||||||||||
|
Optimization — Zusammenfassung
|
||||||||||||
|
Optimization wird analysiert...
|
||||||||||||
|
Where to Buy — Zusammenfassung
|
||||||||||||
|
Where to Buy wird analysiert...
|
||||||||||||
|
Safety / PPE — Zusammenfassung
|
||||||||||||
|
Safety / PPE wird analysiert...
|
||||||||||||
approx.
| kWh | ||||||
|---|---|---|---|---|---|---|
|
KI
|
- | |||||